June 22, 2013 Sprint Introduction: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
No edit summary
No edit summary
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
Welcome to our June 22 Design Sprint. Today is the last sprint prior to our 10 day Build Sprint. However, we do intend to run a Design Sprint next week while we do a Build Sprint at Factor e Farm. This depends on us recruiting a collaborator who can manage contributions at the same time that we run physical buildout at Factor e Farm. This is our general pathway moving forward as we scale our global collaboration.
Welcome to our June 22 Design Sprint. Today is the last sprint prior to our 10 day Build Sprint. However, we do intend to run a Design Sprint next week while we do a Build Sprint at Factor e Farm. This depends on us recruiting a collaborator who can manage contributions at the same time that we run physical buildout at Factor e Farm. This is our general pathway moving forward as we scale our global collaboration.  
 
We have 8 tons of metal coming in next week, and the hydraulics are here. We have at least 6 Power Cubes to work with.
 
Orientation:
 
[[Dashboard]]
[[

Latest revision as of 14:17, 22 June 2013

Welcome to our June 22 Design Sprint. Today is the last sprint prior to our 10 day Build Sprint. However, we do intend to run a Design Sprint next week while we do a Build Sprint at Factor e Farm. This depends on us recruiting a collaborator who can manage contributions at the same time that we run physical buildout at Factor e Farm. This is our general pathway moving forward as we scale our global collaboration.

We have 8 tons of metal coming in next week, and the hydraulics are here. We have at least 6 Power Cubes to work with.

Orientation:

Dashboard [[