=July 11th, 2014= | |||
For next microhouse build should look to other microhouse construction workshops such as: [http://padtinyhouses.com/tiny-house-basics-workshop-2/ PAD tiny houses workshops]; a few things they do differently are early bird pricing, buddy discounts, more emphasis on classroom learning about logistics such as navigating codes, regulations, insurance, how to hook up house to water and power, etc | |||
I think the networks that most need to be connected with (more so than natural builders or permaculturalists, etc) are: architects, urban designers, urban homesteaders | |||
=June 13th, 2014= | |||
Created a rough brochure for CEB press [[file:CEB_press_brouchure_rough.pdf]] | |||
=June 12th, 2014= | |||
Continued gazebo work, measured out distances of supports, dug holes, stopped work due to structural problems in hexayurt roof (was a tension structure, so roof has no structural support) | |||
Helped with pool structure | |||
=June 11th, 2014= | |||
Began prep for building gazebo (weed whacked, drilled holes in 5 gallon bucked and installed rebar crosses and concrete for reinforcement, laid out stakes 85" and 60 degrees from each other) | |||
=June 10th, 2014= | |||
Finished installing exterior skin on laser cutter | |||
=Fri, June 6th, 2014= | |||
Drilled holes for exterior skin and plastic door panels using [http://opensourceecology.org/wiki/LasersaurSkinDrillHoles LasersaurSkinDrillHoles] and [http://www.lasersaur.com/manual/build-frame-panels Lasersaur's online manual] | |||
=Thurs, June 5th, 2014= | |||
Lasersaur work: rerouted e-stop switch wiring to eliminate collision with exterior panels | |||
Rerouted door switch wiring to eliminate collision with plastic door panel | |||
=Wed, June 4th 2014= | |||
Started | |||
[https://docs.google.com/presentation/d/1y4OJj6uhvozVp8MH5PolXLvJt5JYrPxkvBCdeNqNk50/pub?start=false&loop=false&delayms=3000 drawer guide manual] for CEB press [[File:drawerguide.zip]] | |||
<html><iframe src="https://docs.google.com/presentation/d/1y4OJj6uhvozVp8MH5PolXLvJt5JYrPxkvBCdeNqNk50/embed?start=false&loop=false&delayms=3000" frameborder="0" width="1056" height="845" allowfullscreen="true" mozallowfullscreen="true" webkitallowfullscreen="true"></iframe></html> | |||
Completed reassembly of CEB press | |||
=Tue, June 3rd 2014= | |||
Cleaned up workshop | |||
Started brick press assembly | |||
=Mon, June 2nd 2014= | =Mon, June 2nd 2014= | ||
Latest revision as of 13:57, 3 December 2016
July 11th, 2014
For next microhouse build should look to other microhouse construction workshops such as: PAD tiny houses workshops; a few things they do differently are early bird pricing, buddy discounts, more emphasis on classroom learning about logistics such as navigating codes, regulations, insurance, how to hook up house to water and power, etc
I think the networks that most need to be connected with (more so than natural builders or permaculturalists, etc) are: architects, urban designers, urban homesteaders
June 13th, 2014
Created a rough brochure for CEB press File:CEB press brouchure rough.pdf
June 12th, 2014
Continued gazebo work, measured out distances of supports, dug holes, stopped work due to structural problems in hexayurt roof (was a tension structure, so roof has no structural support) Helped with pool structure
June 11th, 2014
Began prep for building gazebo (weed whacked, drilled holes in 5 gallon bucked and installed rebar crosses and concrete for reinforcement, laid out stakes 85" and 60 degrees from each other)
June 10th, 2014
Finished installing exterior skin on laser cutter
Fri, June 6th, 2014
Drilled holes for exterior skin and plastic door panels using LasersaurSkinDrillHoles and Lasersaur's online manual
Thurs, June 5th, 2014
Lasersaur work: rerouted e-stop switch wiring to eliminate collision with exterior panels
Rerouted door switch wiring to eliminate collision with plastic door panel
Wed, June 4th 2014
Started drawer guide manual for CEB press File:Drawerguide.zip
Completed reassembly of CEB press
Tue, June 3rd 2014
Cleaned up workshop
Started brick press assembly
Mon, June 2nd 2014
Removed frame on power cube
Installed screen doors upside down on hablab
Flipped screen doors over