July 11th, 2014
For next microhouse build should look to other microhouse construction workshops such as: PAD tiny houses workshops; a few things they do differently are early bird pricing, buddy discounts, more emphasis on classroom learning about logistics such as navigating codes, regulations, insurance, how to hook up house to water and power, etc
I think the networks that most need to be connected with (more so than natural builders or permaculturalists, etc) are: architects, urban designers, urban homesteaders
June 13th, 2014
Created a rough brochure for CEB press File:CEB press brouchure rough.pdf
June 12th, 2014
Continued gazebo work, measured out distances of supports, dug holes, stopped work due to structural problems in hexayurt roof (was a tension structure, so roof has no structural support) Helped with pool structure
June 11th, 2014
Began prep for building gazebo (weed whacked, drilled holes in 5 gallon bucked and installed rebar crosses and concrete for reinforcement, laid out stakes 85" and 60 degrees from each other)
June 10th, 2014
Finished installing exterior skin on laser cutter
Fri, June 6th, 2014
Drilled holes for exterior skin and plastic door panels using LasersaurSkinDrillHoles and Lasersaur's online manual
Thurs, June 5th, 2014
Lasersaur work: rerouted e-stop switch wiring to eliminate collision with exterior panels
Rerouted door switch wiring to eliminate collision with plastic door panel
Wed, June 4th 2014
Started drawer guide manual for CEB press File:Drawerguide.zip
Completed reassembly of CEB press
Tue, June 3rd 2014
Cleaned up workshop
Started brick press assembly
Mon, June 2nd 2014
Removed frame on power cube
Installed screen doors upside down on hablab
Flipped screen doors over