Jasonshah log: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
(Added {{RightTOC}}) |
||
(8 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
{{RightTOC}} | |||
[[Category:Logs]] | |||
= Fri June6, 2014= | = Fri June6, 2014= | ||
*Completed the instructional for Secondary Cylinder Assembly of the CEB 6 Press. | *Completed the instructional for Secondary Cylinder Assembly of the CEB 6 Press. | ||
<html> <iframe src="https://docs.google.com/presentation/d/1Ckd_mKM8rnVmgQFget9SvhTd-FyEm_2F_5MaJKQkn3U/embed?start=false&loop=false&delayms=3000" frameborder="0" width=" | <html> <iframe src="https://docs.google.com/presentation/d/1Ckd_mKM8rnVmgQFget9SvhTd-FyEm_2F_5MaJKQkn3U/embed?start=false&loop=false&delayms=3000" frameborder="0" width="600" height="450" allowfullscreen="true" mozallowfullscreen="true" webkitallowfullscreen="true"></iframe> </html> | ||
=Thurs June 5, 2014= | =Thurs June 5, 2014= | ||
Line 9: | Line 11: | ||
* Learned about the use of angle grinders and welding operations. Welded wheels to create a mobile steel worktable inside the workshop. | * Learned about the use of angle grinders and welding operations. Welded wheels to create a mobile steel worktable inside the workshop. | ||
* Assisted in moving materials for the raised beds infront of Hablab. | * Assisted in moving materials for the raised beds infront of Hablab. | ||
<html> <a href="https://opensourceecology.trovebox.com/p/4mr/token-faa30b11b5"> | |||
<img src="http://d1odebs29o9vbg.cloudfront.net/custom/201406/IMG_0012-666ca8_800x800.jpg" width="400" height="300"> | |||
</a> </html> | |||
=Wed June 4, 2014= | =Wed June 4, 2014= | ||
Line 14: | Line 20: | ||
[[File:CEB 6 Press_Sec Cylinder Assembly.fcstd]] | [[File:CEB 6 Press_Sec Cylinder Assembly.fcstd]] | ||
* Completed the assembly of a prototype CEB Press with three other collaborators and under Marcin's supervision. | * Completed the assembly of a prototype CEB Press with three other collaborators and under Marcin's supervision. | ||
<html> <a href="https://opensourceecology.trovebox.com/p/4lb/token-4419a274d9"> | |||
<img src="http://d1odebs29o9vbg.cloudfront.net/custom/201406/91AA4C4E-7A79-426C-869D-13F386F8F933-50e924_800x800.jpg" width="400" height="300"> | |||
</a> </html> | |||
=Tues June 3, 2014= | =Tues June 3, 2014= |
Latest revision as of 13:58, 3 December 2016
Fri June6, 2014
- Completed the instructional for Secondary Cylinder Assembly of the CEB 6 Press.
Thurs June 5, 2014
- Ongoing work on the Google presentation on the instructional of the Secondary Cylinder Assembly, CEB 6 Press.
- Swarmed with the summer team in the organization efforts at the Workshop.
- Learned about the use of angle grinders and welding operations. Welded wheels to create a mobile steel worktable inside the workshop.
- Assisted in moving materials for the raised beds infront of Hablab.
Wed June 4, 2014
- Started the work on instructional for the Secondary Cylinder Assembly of the CEB 6 Press
File:CEB 6 Press Sec Cylinder Assembly.fcstd
- Completed the assembly of a prototype CEB Press with three other collaborators and under Marcin's supervision.
Tues June 3, 2014
- Learned about several functions for operation of FreeCAD.
- Coordinated the workshop area for access to Power Machines and Hydraulics units.
- Worked with a group to assemble the CEB 6 Press; partial assembly accomplished but confusion with the general outlay of the machine.
Mon June 2, 2014
- Morning session: Learning about features in the OSE Collaboration Architecture
- Build session: Built a 4' * 8' prototype for a panel. Used 2" * 4" wooden beams and screws. These panels can be used for walls, decks. For info go to, chrisc_log
- Assisted in the Agricultural Plantout
June 1, 2014
- Arrived on Factor e Farm Campus. Orientation with the summer team.