= Fri June6, 2014= | = Fri June6, 2014= | ||
*Completed the instructional for Secondary Cylinder Assembly of the CEB 6 Press. | *Completed the instructional for Secondary Cylinder Assembly of the CEB 6 Press. | ||
Line 10: | Line 13: | ||
<html> <a href="https://opensourceecology.trovebox.com/p/4mr/token-faa30b11b5"> | <html> <a href="https://opensourceecology.trovebox.com/p/4mr/token-faa30b11b5"> | ||
<img src="http://d1odebs29o9vbg.cloudfront.net/custom/201406/IMG_0012-666ca8_800x800.jpg"> | <img src="http://d1odebs29o9vbg.cloudfront.net/custom/201406/IMG_0012-666ca8_800x800.jpg" width="400" height="300"> | ||
</a> </html> | </a> </html> | ||
Line 17: | Line 20: | ||
[[File:CEB 6 Press_Sec Cylinder Assembly.fcstd]] | [[File:CEB 6 Press_Sec Cylinder Assembly.fcstd]] | ||
* Completed the assembly of a prototype CEB Press with three other collaborators and under Marcin's supervision. | * Completed the assembly of a prototype CEB Press with three other collaborators and under Marcin's supervision. | ||
<html> <a href="https://opensourceecology.trovebox.com/p/4lb/token-4419a274d9"> | |||
<img src="http://d1odebs29o9vbg.cloudfront.net/custom/201406/91AA4C4E-7A79-426C-869D-13F386F8F933-50e924_800x800.jpg" width="400" height="300"> | |||
</a> </html> | |||
=Tues June 3, 2014= | =Tues June 3, 2014= |
Latest revision as of 13:58, 3 December 2016
Fri June6, 2014
- Completed the instructional for Secondary Cylinder Assembly of the CEB 6 Press.
Thurs June 5, 2014
- Ongoing work on the Google presentation on the instructional of the Secondary Cylinder Assembly, CEB 6 Press.
- Swarmed with the summer team in the organization efforts at the Workshop.
- Learned about the use of angle grinders and welding operations. Welded wheels to create a mobile steel worktable inside the workshop.
- Assisted in moving materials for the raised beds infront of Hablab.
Wed June 4, 2014
- Started the work on instructional for the Secondary Cylinder Assembly of the CEB 6 Press
File:CEB 6 Press Sec Cylinder Assembly.fcstd
- Completed the assembly of a prototype CEB Press with three other collaborators and under Marcin's supervision.
Tues June 3, 2014
- Learned about several functions for operation of FreeCAD.
- Coordinated the workshop area for access to Power Machines and Hydraulics units.
- Worked with a group to assemble the CEB 6 Press; partial assembly accomplished but confusion with the general outlay of the machine.
Mon June 2, 2014
- Morning session: Learning about features in the OSE Collaboration Architecture
- Build session: Built a 4' * 8' prototype for a panel. Used 2" * 4" wooden beams and screws. These panels can be used for walls, decks. For info go to, chrisc_log
- Assisted in the Agricultural Plantout
June 1, 2014
- Arrived on Factor e Farm Campus. Orientation with the summer team.