Door Requirement: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
No edit summary
No edit summary
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
*Bond beam is directly above it.
*Bond beam is directly above it.
*Finishing detail involves direct transition from door frame to stucco metal lath without need for any other trim
*Finishing detail involves direct transition from door frame to stucco metal lath without need for any other trim
*Exterior Library North French Doors: left inswing (opening to the inside)
*Exterior Utility South Door: right inswing (opening to the inside)
*Exterior Utility East Door: right inswing (opening to the inside)
<html><iframe src="https://docs.google.com/presentation/d/16M_ua0e8h9DZGiiH34Jc7KFiR_D0jGq7IWTQKjLOXFw/embed?start=false&loop=false&delayms=3000" frameborder="0" width="960" height="569" allowfullscreen="true" mozallowfullscreen="true" webkitallowfullscreen="true"></iframe></html>

Latest revision as of 16:22, 10 September 2014

  • Door is only 7' high (same as wall) because of the height requirement of ceiling.
  • Door must be integrated into 1' thick CEB wall with stucco and 2" EPS insulation.
  • Bond beam is directly above it.
  • Finishing detail involves direct transition from door frame to stucco metal lath without need for any other trim
  • Exterior Library North French Doors: left inswing (opening to the inside)
  • Exterior Utility South Door: right inswing (opening to the inside)
  • Exterior Utility East Door: right inswing (opening to the inside)