The Liberator Packing List: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
No edit summary
m (Text replace - "openfarmtech.org/weblog" to "blog.opensourceecology.org")
 
(11 intermediate revisions by 2 users not shown)
Line 1: Line 1:
The first step in assembling The Liberator is unpacking the crate, in the reverse order as shown on the [http://openfarmtech.org/weblog/?p=1967 blog]. First, assess that you can identify all the following parts. The machine labels in Fig. 2 and 3 and [http://openfarmtech.org/weblog/?p=1749 blog post] should help to identify all the parts.
{{Category=CEB press}}
The first step in assembling The Liberator is unpacking the crate, in the reverse order as shown on the [http://blog.opensourceecology.org/?p=1967 blog]. First, assess that you can identify all the following parts. The machine labels in Fig. 2 and 3 and [http://blog.opensourceecology.org/?p=1749 blog post] should help.




Line 6: Line 7:
[[Image:machine-front.jpg|thumb|Fig. 2. Machine front view.]]
[[Image:machine-front.jpg|thumb|Fig. 2. Machine front view.]]
[[Image:machine-back.jpg|thumb|Fig. 3. Machine rear view.]]
[[Image:machine-back.jpg|thumb|Fig. 3. Machine rear view.]]
[[Image:roller-guides.jpg|thumb|Fig. 4. Roller guides.]]
[[Image:shaker motor.jpg|thumb|Fig. 5. Shaker motor with return line assembly.]]
[[Image:shaker-assembly.jpg|thumb|Fig. 6. Soil shaker assembly.]]
[[Image:secondary-sens-assy.jpg|thumb|Fig. 7. Secondary cylinder sensor assembly.]]
[[Image:grate-mounts.jpg|thumb|Fig. 8. Grate mounts.]]
[[Image:hopper-mounting-plate.jpg|thumb|Fig. 9. Hopper mounting plate.]]
[[Image:main-cyl-sensor.jpg|thumb|Fig. 10. Main cylinder sensor.]]
[[Image:sec-cyl-sensor.jpg|thumb|Fig. 11. Secondary cylinder sensor.]]
[[Image:solenoid-valve.jpg|thumb|Fig. 12. Solenoid valve.]]
[[Image:sec-cyl-hose-assy.jpg|thumb|Fig. 13. Secondary cylinder hose assembly.]]
[[Image:6-foot-hose.jpg|thumb|Fig. 14. Main cylinder and shaker hoses (4 total, 6 foot long each).]]
[[Image:main-hose.jpg|thumb|Fig. 15. Main hose assembly.]]
[[Image:soil-sensor.jpg|thumb|Fig. 16. Soil sensor assembly.]]
[[Image:ceb-controller.jpg|thumb|Fig. 17. Controller box.]]




The packing list is:
The packing list is:
#Frame
#Hopper sheet metal (4)
#Frame with main cylinder
#Soil grate
#Soil grate
#Arms (2) - primary
#Arms (2) - primary
Line 19: Line 35:
#Front hopper supports (2)
#Front hopper supports (2)
#Roller guides (2) (Fig. 4)
#Roller guides (2) (Fig. 4)
[[Image:roller-guides.jpg|thumb|Fig. 4. Roller guides.]]
#Shaker motor (Fig. 5)
#Shaker motor (Fig. 5)
[[Image:shaker motor.jpg|thumb|Fig. 5. Shaker motor with return line assembly.]]
#Shaker motor return line assembly with needle valve (Fig. 5)
#Shaker motor return line assembly with needle valve (Fig. 5)
#Secondary cylinder
#Secondary cylinder
#Soil shaker assembly (Fig. 6)
#Soil shaker assembly (Fig. 6)
[[Image:shaker-assembly.jpg|thumb|Fig. 6. Soil shaker assembly.]]
#Secondary cylinder sensor assembly (Fig. 7)
#
#Grate mounts (4 pieces) (Fig. 8)
 
#Hopper mounting plate (Fig. 9)
 
#Main cylinder sensor (Fig. 10)
 
#Secondary cylinder sensor (Fig. 11)
 
#Solenoid valve (Fig. 12)
 
#Secondary cylinder hose assembly (Fig. 13)
 
#Shaker hoses and main cylinder hoses, 6 foot long (4) (Fig. 14)
 
#Main hose assembly (Fig. 15)
 
#Soil sensor assembly (Fig. 16)
[[Category:The Liberator Full Product Release]]
#Controller box and cord (Fig. 17)

Latest revision as of 17:32, 2 July 2013

The first step in assembling The Liberator is unpacking the crate, in the reverse order as shown on the blog. First, assess that you can identify all the following parts. The machine labels in Fig. 2 and 3 and blog post should help.


Crate.jpg
Fig. 2. Machine front view.
Fig. 3. Machine rear view.
Fig. 4. Roller guides.
Fig. 5. Shaker motor with return line assembly.
Fig. 6. Soil shaker assembly.
Fig. 7. Secondary cylinder sensor assembly.
Fig. 8. Grate mounts.
Fig. 9. Hopper mounting plate.
Fig. 10. Main cylinder sensor.
Fig. 11. Secondary cylinder sensor.
Fig. 12. Solenoid valve.
Fig. 13. Secondary cylinder hose assembly.
Fig. 14. Main cylinder and shaker hoses (4 total, 6 foot long each).
Fig. 15. Main hose assembly.
Fig. 16. Soil sensor assembly.
Fig. 17. Controller box.


The packing list is:

  1. Hopper sheet metal (4)
  2. Frame with main cylinder
  3. Soil grate
  4. Arms (2) - primary
  5. Arms (2) - secondary - the ones with the leg holders
  6. Soil loading drawer
  7. Legs (4)
  8. Feet (4)
  9. Back hopper supports (2)
  10. Front hopper supports (2)
  11. Roller guides (2) (Fig. 4)
  12. Shaker motor (Fig. 5)
  13. Shaker motor return line assembly with needle valve (Fig. 5)
  14. Secondary cylinder
  15. Soil shaker assembly (Fig. 6)
  16. Secondary cylinder sensor assembly (Fig. 7)
  17. Grate mounts (4 pieces) (Fig. 8)
  18. Hopper mounting plate (Fig. 9)
  19. Main cylinder sensor (Fig. 10)
  20. Secondary cylinder sensor (Fig. 11)
  21. Solenoid valve (Fig. 12)
  22. Secondary cylinder hose assembly (Fig. 13)
  23. Shaker hoses and main cylinder hoses, 6 foot long (4) (Fig. 14)
  24. Main hose assembly (Fig. 15)
  25. Soil sensor assembly (Fig. 16)
  26. Controller box and cord (Fig. 17)