Business Plan 2015: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
No edit summary
No edit summary
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
*Proofs of Concept Achieved
*Proofs of Concept Achieved
*University Model and Scaling (ref to 2013 plan)
*University Model and Scaling (ref to 2013 plan)
* Extreme Manufacturing and Extreme Learning (ref to. Google talk)
*Basic economic analysis and projections
* Extreme Manufacturing Model and Extreme Learning (ref to. Google talk)
*curriculum
*curriculum
*Timeline
*Timeline
*GVCS value proposition as a package towards solving pressing issues, technical strategy for sequencing, release schedule
*GVCS value proposition as a package towards solving pressing issues, technical strategy for sequencing, release schedule
:*Hardware: construction set
*Development Protocol
*Development Protocol
:*Zachman framework - at different levels
:*XM
:*Flashy XM - swarming
<html><iframe src="https://docs.google.com/presentation/d/1qf-kt_utcmurl3xpFdE5X8z_3_js8kS9WJuh4u0bXms/embed?start=false&loop=false&delayms=3000" frameborder="0" width="960" height="569" allowfullscreen="true" mozallowfullscreen="true" webkitallowfullscreen="true"></iframe></html>

Latest revision as of 19:32, 25 December 2014

  • Values and Specifications
  • 2014 Transition to Service Earning
  • Proofs of Concept Achieved
  • University Model and Scaling (ref to 2013 plan)
  • Basic economic analysis and projections
  • Extreme Manufacturing Model and Extreme Learning (ref to. Google talk)
  • curriculum
  • Timeline
  • GVCS value proposition as a package towards solving pressing issues, technical strategy for sequencing, release schedule
  • Hardware: construction set
  • Development Protocol
  • Zachman framework - at different levels
  • XM
  • Flashy XM - swarming