Collaboration Infrastructure: Difference between revisions
Jump to navigation
Jump to search
(Created page with "*OSE Collaborator's Guide *OSE Developer's guide *Developer's guide for each of 20 main projects *Design guide for each of the 50 machines *FreeCAD construction Set for each o...") |
No edit summary |
||
(One intermediate revision by the same user not shown) | |||
Line 5: | Line 5: | ||
*FreeCAD construction Set for each of 20 and 50 areas. | *FreeCAD construction Set for each of 20 and 50 areas. | ||
*Forum for each, with a facilitator | *Forum for each, with a facilitator | ||
*Long Term Roadmap for each project | |||
*actionable prioritized 1-2 year Roadmap for each active area | |||
*Bug tracker for each | |||
*OSE Book to explain the product ecologies and tech possibility at a high level | |||
*HR Team Manual | |||
*Process Manager's manual |
Latest revision as of 18:04, 14 April 2016
- OSE Collaborator's Guide
- OSE Developer's guide
- Developer's guide for each of 20 main projects
- Design guide for each of the 50 machines
- FreeCAD construction Set for each of 20 and 50 areas.
- Forum for each, with a facilitator
- Long Term Roadmap for each project
- actionable prioritized 1-2 year Roadmap for each active area
- Bug tracker for each
- OSE Book to explain the product ecologies and tech possibility at a high level
- HR Team Manual
- Process Manager's manual