Ideas for Product 2018: Difference between revisions
		
		
		
		
		
		Jump to navigation
		Jump to search
		
				
		
		
	
| No edit summary | |||
| (4 intermediate revisions by 2 users not shown) | |||
| Line 1: | Line 1: | ||
| Here's the few things ppl would build to get xp with understanding how the printer works.   | =Case Scenario= | ||
| *When it's important to understand how a 3D printer works.  | |||
| Estimated time saved: -4 axes, -soldering, -some control panel loop ties, -mini-asembly of extruder | *For maximizing learning objectives, not build experience | ||
| *Here's the few things ppl would build to get xp with understanding how the printer works.   | |||
| *Estimated time saved: -4 axes, -soldering, -some control panel loop ties, -mini-asembly of extruder | |||
| Axis: (add completed) | Axis: (add completed) | ||
| Line 30: | Line 32: | ||
| *Extruder - 45 min | *Extruder - 45 min | ||
| *Heat Bed - 45 min | *Heat Bed - 45 min | ||
| Total: 6.5 hours | |||
| =Plus Budget= | |||
| * Print 1hr | |||
| * Clean cables 1hr | |||
| =Basic Scenario for a Mechanical Build= | |||
| *Axes build - 2.5 hours - then assemble everything. | |||
Latest revision as of 14:27, 19 September 2018
Case Scenario
- When it's important to understand how a 3D printer works.
- For maximizing learning objectives, not build experience
- Here's the few things ppl would build to get xp with understanding how the printer works.
- Estimated time saved: -4 axes, -soldering, -some control panel loop ties, -mini-asembly of extruder
Axis: (add completed)
* touch motor + drive pully * build idler * tension belt
Heated Bed:
* add therminster,
Control Panel:
* connect arduino to ramps board * Connect power supply * thermister,
Extruder:
* assemble completed elements to make extruder * add fan * add sensor
Assembly:
* put on the x-axis * hook up the x-axis * connect arduino to control panel * connect extruder thermister, heating element, motor * print
Base Budget
- Frame 1 hr
- Axes - 30 min x 5 = 2.5 hrs
- Control panel - 1.5 hrs
- Extruder - 45 min
- Heat Bed - 45 min
Total: 6.5 hours
Plus Budget
- Print 1hr
- Clean cables 1hr
Basic Scenario for a Mechanical Build
- Axes build - 2.5 hours - then assemble everything.