Extreme Enterprise Log: Difference between revisions
Jump to navigation
Jump to search
(12 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
=Previous Design Concept= | link - [[Extreme Enterprise Event Design]] | ||
=Tue Jul 20, 2020= | |||
==Marcin's Presentation for FABxLive== | |||
<html><iframe src="https://docs.google.com/presentation/d/e/2PACX-1vSOglVyjVs4pdDqJNjF5ueilXGFtsqR7x-i_IMtCO4Q7ISPQgO3qfvtAmC4WsMQzKLVZrrcMydVTU76/embed?start=false&loop=false&delayms=3000" frameborder="0" width="480" height="299" allowfullscreen="true" mozallowfullscreen="true" webkitallowfullscreen="true"></iframe></html> | |||
[https://docs.google.com/presentation/d/1wJ70NJd21TEoV1kgCZ1QVa6_3laQ8Y-W-7LzLx68nNs/edit#slide=id.g77b7fdd8cd_1_57 edit] | |||
=July 20, 2020= | |||
Previous Design Concept= | |||
#People pay. '''Q: How do you measure buy-in PRIOR to the event?'''. This is a second part of having people show up. | #People pay. '''Q: How do you measure buy-in PRIOR to the event?'''. This is a second part of having people show up. | ||
#We are testing '''why aren't people showing up.''' (as opposed to 'how do we get people to show up. We have a strong and almost 100% conviction that Enterprise (ability to obtain a valuable product to fulfill self-interest, whether a usufruct product or an enterprise for making a living) | #We are testing '''why aren't people showing up.''' (as opposed to 'how do we get people to show up. We have a strong and almost 100% conviction that Enterprise (ability to obtain a valuable product to fulfill self-interest, whether a usufruct product or an enterprise for making a living) may be the missing part. | ||
=Product Strategy= | =Product Strategy= | ||
Summary: 2000 participants get 2000 houses, with $20M revenue to OSE. | |||
'''Build a house to change the world''' | '''Build a house to change the world''' | ||
#$10k per seat to participate in XE Event. ($30k per house for after the event) | #$10k per seat to participate in XE Event. But, rigorous skill-set requirements exist. ($30k per house for after the event). '''Preorders ONLY FOR PARTICIPANTS?''' | ||
##Product proper: $50k package total, BYOL. $1k to non-refundable at-risk investment to participate. Total $10k. We need to convince people that it's possible, based on existing documentation and experience. Produce worst-case scenario. '''Basic Ergonomics per 250 SF''' - 16 wall, 16 roof and floor modules. 32 modules. 32 weekends, of 2 | ##Product proper: $50k package total, BYOL. $1k to non-refundable at-risk investment to participate. Total $10k. We need to convince people that it's possible, based on existing documentation and experience. Produce worst-case scenario. '''Basic Ergonomics per 250 SF''' - 16 wall, 16 roof and floor modules. 32 modules. 32 weekends, of 2 hours with 1 person. Includes pile driver attachment for Bobcat, or can be done manually with 2 people. Thus, 6 hour weekends for 3 panels per weekend, for 750 sf, plus a patio ready for next addition. 750-1000 is the sweet spot without a heroic effort. | ||
##2000 houses produced. 1000 in one year (first batch of 100 entrepreneurs, with 10 houses each guaranteed). New OSE Chapters - 100 entrepreneurs, 10 houses each - by Year 2. '''Note''': this does not leave room for outside house builds. | ##2000 houses produced. 1000 in one year (first batch of 100 entrepreneurs, with 10 houses each guaranteed). New OSE Chapters - 100 entrepreneurs, 10 houses each - by Year 2. '''Note''': this does not leave room for outside house builds. | ||
##$20M revenue funds 20 OSE facilities USA wide, for continued R&D. | |||
##3 Tracks: Participants, Entrepreneurs, OSE Chapters. '''Participants''' - SME stakeholders in house. | ##3 Tracks: Participants, Entrepreneurs, OSE Chapters. '''Participants''' - SME stakeholders in house. | ||
#House build in Summer of Extreme Design Build 2021 - with 100 onsite participants (enterprise trainees) with OSE infrastructure upgrades (RV park, outdoor kitchen/bath, camp) - to handle 200 participants. | #House build in Summer of Extreme Design Build 2021 - with 100 onsite participants (enterprise trainees) with OSE infrastructure upgrades (RV park, outdoor kitchen/bath, camp) - to handle 200 participants. | ||
Line 19: | Line 30: | ||
#Crowd Supply - real development - to generate initial interest in XE, as this will be the foundation for the Large Printer for house panels. | #Crowd Supply - real development - to generate initial interest in XE, as this will be the foundation for the Large Printer for house panels. | ||
#Kickstarter - essentially distribution and funding for the Open Building Institute Take 2, where we also say that we are discovering a way to get beyond the Heroic Effort by leveraging the crowds. | #Kickstarter - essentially distribution and funding for the Open Building Institute Take 2, where we also say that we are discovering a way to get beyond the Heroic Effort by leveraging the crowds. | ||
=Cost Baseline= | |||
=Role Architecture= | |||
https://docs.google.com/presentation/d/1SRURFGytDIooffnPRnV2YD_Sjp3yKKMe0pmCvmcAqfk/edit#slide=id.g8c7ff0131d_0_104 | |||
=Product Scope= | |||
#OSE ships ALL parts - saves a month of sourcing time for client. OSE resolves admissible parts list. | |||
#OSE hires out the foundation build or does the foundation build itself. | |||
#OSE provides Continuous Development Commitment - OSE commits to making everything the ''Last X You Will Ever Have to Buy'' guarantee by investing in OSE Microfactories for service, and providing production machines to make replacement parts, including motors and gears!!!! | |||
#Client submits building plans to pull a permit at their local building department. | |||
#Client makes 3 panels each weekend for 32 weeks by themselves in 6 hours of time, or correspondingly less with friends. | |||
#Client builds out the [[Utility Module]], Kitchen Module, and Bathroom Module in 4 weeks each, for a total of 44 weeks so far. This is generous timing - we built the utility module in 1 | |||
#Client spends one week (40) with a friend to build the whole house. | |||
=$10k Service Fee House Product= | =$10k Service Fee House Product= | ||
#Special offer to Participants | |||
#Cost of $50k for a 1000 sf house that you can build with a friend in one week, BYOL. | #Cost of $50k for a 1000 sf house that you can build with a friend in one week, BYOL. | ||
=$30k Service Fee House Product= | |||
#This is what we advertise the cost for after the event. | |||
#Cost of $70k for a 1000 sf house that you can build with a friend in one week, BYOL. | |||
=Full Service Event= | |||
#Data: nationwide materials and contractors supply - markets this to all contractors. | |||
#$100k for a house you build in one weekend. Foundation included. $25k in materials. | |||
#Panel builds economics - 24 | |||
=Economics Summary= | =Economics Summary= |
Latest revision as of 16:54, 28 July 2020
link - Extreme Enterprise Event Design
Tue Jul 20, 2020
Marcin's Presentation for FABxLive
July 20, 2020
Previous Design Concept=
- People pay. Q: How do you measure buy-in PRIOR to the event?. This is a second part of having people show up.
- We are testing why aren't people showing up. (as opposed to 'how do we get people to show up. We have a strong and almost 100% conviction that Enterprise (ability to obtain a valuable product to fulfill self-interest, whether a usufruct product or an enterprise for making a living) may be the missing part.
Product Strategy
Summary: 2000 participants get 2000 houses, with $20M revenue to OSE. Build a house to change the world
- $10k per seat to participate in XE Event. But, rigorous skill-set requirements exist. ($30k per house for after the event). Preorders ONLY FOR PARTICIPANTS?
- Product proper: $50k package total, BYOL. $1k to non-refundable at-risk investment to participate. Total $10k. We need to convince people that it's possible, based on existing documentation and experience. Produce worst-case scenario. Basic Ergonomics per 250 SF - 16 wall, 16 roof and floor modules. 32 modules. 32 weekends, of 2 hours with 1 person. Includes pile driver attachment for Bobcat, or can be done manually with 2 people. Thus, 6 hour weekends for 3 panels per weekend, for 750 sf, plus a patio ready for next addition. 750-1000 is the sweet spot without a heroic effort.
- 2000 houses produced. 1000 in one year (first batch of 100 entrepreneurs, with 10 houses each guaranteed). New OSE Chapters - 100 entrepreneurs, 10 houses each - by Year 2. Note: this does not leave room for outside house builds.
- $20M revenue funds 20 OSE facilities USA wide, for continued R&D.
- 3 Tracks: Participants, Entrepreneurs, OSE Chapters. Participants - SME stakeholders in house.
- House build in Summer of Extreme Design Build 2021 - with 100 onsite participants (enterprise trainees) with OSE infrastructure upgrades (RV park, outdoor kitchen/bath, camp) - to handle 200 participants.
- Concurrent Collaborative Design Challenge deployed at time of the event - large printer. But this is an extra, not an essential.
- Concurrent challenge to do the High T printer - Crowd Supply.
- Need $250-500k for seed money to organize event.
- $100-200 for the Book.
- Proof-of-concept 256 sf prototype prior to campaign! Get a few people, video it.
- Do the HeroX, Crowd Supply, and Kickstarter at the same time. Free copy of e-book to all people who made OBI kickstarter possible.
- HeroX does the large printer. We do another XE event for the printer build - not part of the HeroX. HeroX is just a reward, but also primarily for publicity sake.
- Crowd Supply - real development - to generate initial interest in XE, as this will be the foundation for the Large Printer for house panels.
- Kickstarter - essentially distribution and funding for the Open Building Institute Take 2, where we also say that we are discovering a way to get beyond the Heroic Effort by leveraging the crowds.
Cost Baseline
Role Architecture
Product Scope
- OSE ships ALL parts - saves a month of sourcing time for client. OSE resolves admissible parts list.
- OSE hires out the foundation build or does the foundation build itself.
- OSE provides Continuous Development Commitment - OSE commits to making everything the Last X You Will Ever Have to Buy guarantee by investing in OSE Microfactories for service, and providing production machines to make replacement parts, including motors and gears!!!!
- Client submits building plans to pull a permit at their local building department.
- Client makes 3 panels each weekend for 32 weeks by themselves in 6 hours of time, or correspondingly less with friends.
- Client builds out the Utility Module, Kitchen Module, and Bathroom Module in 4 weeks each, for a total of 44 weeks so far. This is generous timing - we built the utility module in 1
- Client spends one week (40) with a friend to build the whole house.
$10k Service Fee House Product
- Special offer to Participants
- Cost of $50k for a 1000 sf house that you can build with a friend in one week, BYOL.
$30k Service Fee House Product
- This is what we advertise the cost for after the event.
- Cost of $70k for a 1000 sf house that you can build with a friend in one week, BYOL.
Full Service Event
- Data: nationwide materials and contractors supply - markets this to all contractors.
- $100k for a house you build in one weekend. Foundation included. $25k in materials.
- Panel builds economics - 24