Fieldsight: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
(Created page with "https://app.fieldsight.org/users/accounts/login/")
 
 
(5 intermediate revisions by the same user not shown)
Line 1: Line 1:
https://app.fieldsight.org/users/accounts/login/
=About=
'''An app for remote monitoring of construction projects. FOSS.'''
 
Site - https://app.fieldsight.org/users/accounts/login/
 
Github - https://github.com/fieldsight
 
The UN oversees FieldSight - [https://www.openigo.com/vacancies/fieldsight-coordinator/]
 
=Concept=
The concept is that the builder uses an app to take pictures at select checkpoints according to well-defined instructions. The dev team then provides feedback.
 
Specific checkpoints for the [[Seed Home 2]] may include:
#Site graded - site is level - according to laser level results on 4 corners with markings of level on each post. Or using a string level.
#Building location square - 4 stakes on corners with 3 points for triangulation: 1. distance of long side = 32'. 2. Cross distance 1 - 35' 9.3". Cross distance 2 - 35' 9.3". 4 pictures: one overall site, 2 is measuring tape closeup for long side, 3 is measuring tape closeup at cross 1, and 4 is measure closeup at cross 2
#Foundation location level - string 1/2" above foundation, laser videod beeping on top of the foundation.
 
Datails based on detailed build procedures.

Latest revision as of 03:25, 3 February 2022

About

An app for remote monitoring of construction projects. FOSS.

Site - https://app.fieldsight.org/users/accounts/login/

Github - https://github.com/fieldsight

The UN oversees FieldSight - [1]

Concept

The concept is that the builder uses an app to take pictures at select checkpoints according to well-defined instructions. The dev team then provides feedback.

Specific checkpoints for the Seed Home 2 may include:

  1. Site graded - site is level - according to laser level results on 4 corners with markings of level on each post. Or using a string level.
  2. Building location square - 4 stakes on corners with 3 points for triangulation: 1. distance of long side = 32'. 2. Cross distance 1 - 35' 9.3". Cross distance 2 - 35' 9.3". 4 pictures: one overall site, 2 is measuring tape closeup for long side, 3 is measuring tape closeup at cross 1, and 4 is measure closeup at cross 2
  3. Foundation location level - string 1/2" above foundation, laser videod beeping on top of the foundation.

Datails based on detailed build procedures.