120 Design Lessons - Day 004: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
Davidleasure (talk | contribs) m (Davidleasure moved page 120 Design Lessons - Day 4 to 120 Design Lessons - Day 004) |
||
(5 intermediate revisions by 2 users not shown) | |||
Line 4: | Line 4: | ||
[https://docs.google.com/presentation/d/1VR3zrHXGABWap2esgIhsAX1nN_TGQsDZoAbmVcg0Xdg/edit#slide=id.gb328b2d63d_0_9 edit] | [https://docs.google.com/presentation/d/1VR3zrHXGABWap2esgIhsAX1nN_TGQsDZoAbmVcg0Xdg/edit#slide=id.gb328b2d63d_0_9 edit] | ||
= | =Seed Home Build Status= | ||
[https://docs.google.com/spreadsheets/d/1qj4jscvrLyvwBTlUVRyJSC-ETpoR4CJ266BdG0Ly4AM/edit?usp=sharing| Wall Module Build Status] | |||
=Schedule for the Next 10 Days= | |||
*[[120 Design Lessons - Day 5]] - Day 1 - Walls. 38. 38 walls take 14 feet to store. | |||
*[[120 Design Lessons - Day 6]] - Day 2 - Walls Finish. | |||
*[[120 Design Lessons - Day 7]] - Day 3 - Doors and Windows | |||
*[[120 Design Lessons - Day 8]] - Day 4 - Interior Walls | |||
*[[120 Design Lessons - Day 9]] - Day 5 - Prepare joist hangers and blocking | |||
*[[120 Design Lessons - Day 10]] - Day 6 - Garage Materials | |||
*[[120 Design Lessons - Day 11]] - Day 7 - Install - first Floor walls, second story platform, second story walls | |||
*[[120 Design Lessons - Day 12]] - Day 8 - Install Garage | |||
*[[120 Design Lessons - Day 13]] - Day 9 - Install Roof | |||
*[[120 Design Lessons - Day 14]] - Day 10 - Interior - paneling, ceiling, bathroom, kitchen, electrical runs | |||
=Notes= | |||
=Template= | =Template= |
Latest revision as of 22:20, 15 July 2021
Day 4 - SEH 2 Wall Design - Day 1 of Build
Seed Home Build Status
Schedule for the Next 10 Days
- 120 Design Lessons - Day 5 - Day 1 - Walls. 38. 38 walls take 14 feet to store.
- 120 Design Lessons - Day 6 - Day 2 - Walls Finish.
- 120 Design Lessons - Day 7 - Day 3 - Doors and Windows
- 120 Design Lessons - Day 8 - Day 4 - Interior Walls
- 120 Design Lessons - Day 9 - Day 5 - Prepare joist hangers and blocking
- 120 Design Lessons - Day 10 - Day 6 - Garage Materials
- 120 Design Lessons - Day 11 - Day 7 - Install - first Floor walls, second story platform, second story walls
- 120 Design Lessons - Day 12 - Day 8 - Install Garage
- 120 Design Lessons - Day 13 - Day 9 - Install Roof
- 120 Design Lessons - Day 14 - Day 10 - Interior - paneling, ceiling, bathroom, kitchen, electrical runs