OSE Botswana: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
No edit summary
m (Added a Category to the Page)
 
(4 intermediate revisions by 2 users not shown)
Line 1: Line 1:
=='''OSE Botswana Plan'''==
=OSE Botswana Plan=
[[Africa Budget]], [[Africa Pilot]], Citizen Entrepreneurial Development Agency (CEDA)[https://www.ceda.co.bw/], Local Enterprise Authority (LEA)[http://www.lea.co.bw/]
[[Africa Budget]], [[Africa Pilot]], Citizen Entrepreneurial Development Agency (CEDA)[https://www.ceda.co.bw/], Local Enterprise Authority (LEA)[http://www.lea.co.bw/] for funding. 


----
=Business Plan Draft=
=='''Land Allocation'''==
 
Approximately 80 hectares (200 Acres) available for site of OSE Botswana - Location Mantshadidi Near Palapye, Botswana (GPS Coordinates TBA)
https://docs.google.com/document/d/1if8J_cMsjpGxNN9tUYF0azJIIjbIunTOBkUrExHRIXE/edit
 
=Land Allocation=
Approximately 92.8 hectares (229 Acres) available for site of OSE Botswana - Location Mantshadidi Near Palapye, Botswana (GPS Coordinates TBA)
Sample certificate of one of the plots of land allocated to Makunga Family members: [[File:Certificate of Customary Land Grant.pdf]]
Sample certificate of one of the plots of land allocated to Makunga Family members: [[File:Certificate of Customary Land Grant.pdf]]


----
----
=='''OSE Microfactory and Campus Botswana'''==
 
=OSE Microfactory and Campus Botswana=
Planning:  
Planning:  
* need water - borehole?
* need water - borehole?
Line 17: Line 21:
1st phase need workshop and CEB press to begin building infrastructure - staff housing, dorms & cabins.
1st phase need workshop and CEB press to begin building infrastructure - staff housing, dorms & cabins.
Need Site plan.
Need Site plan.
CEB house plans, dorms and cabin plans
CEB house plans, dorms and cabin plans.
Bus in casual labourers to build infrastructure.
Bus in casual labourers to build infrastructure.
Fly in MJ & CM for CEB build and other machines for workshop.
Fly in MJ & CM for CEB build and other machines for workshop.
[[Category: OSE Botswana]]

Latest revision as of 03:57, 13 November 2022

OSE Botswana Plan

Africa Budget, Africa Pilot, Citizen Entrepreneurial Development Agency (CEDA)[1], Local Enterprise Authority (LEA)[2] for funding.

Business Plan Draft

https://docs.google.com/document/d/1if8J_cMsjpGxNN9tUYF0azJIIjbIunTOBkUrExHRIXE/edit

Land Allocation

Approximately 92.8 hectares (229 Acres) available for site of OSE Botswana - Location Mantshadidi Near Palapye, Botswana (GPS Coordinates TBA) Sample certificate of one of the plots of land allocated to Makunga Family members: File:Certificate of Customary Land Grant.pdf


OSE Microfactory and Campus Botswana

Planning:

  • need water - borehole?
  • Power - Generator to power welders
  • Foundation Slab - for workshop: 15m x 20m with roof.
  • CEB press parts
  • Toilets and showers

1st phase need workshop and CEB press to begin building infrastructure - staff housing, dorms & cabins. Need Site plan. CEB house plans, dorms and cabin plans. Bus in casual labourers to build infrastructure. Fly in MJ & CM for CEB build and other machines for workshop.