=Checklist= | |||
*https://mybuildingpermit.com/sites/default/files/documentation/Plumbing%20Final.pdf | *https://mybuildingpermit.com/sites/default/files/documentation/Plumbing%20Final.pdf | ||
=Test= | |||
*Close sewer and top vent. Fill traps of all fixtures. Flush toilet. If water does not go down in toilet, then system is air tight, test passed. [https://www.youtube.com/watch?v=d43KqUo6bTI] | |||
=Links= | |||
*[[Rough-In Plumbing Inspection]] | |||
[[Category: Building Inspections]] |