How to Think Like an Inspector: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
=Rough Plumbing=
=Rough Plumbing=
*https://www.youtube.com/watch?v=JKzca-Hqurw - pressure on waste at 5 psi sealed on both ends, water supply at 125 psi. Hose clamps + rubber seals on DWV.
*https://www.youtube.com/watch?v=JKzca-Hqurw - pressure on waste at 5 psi sealed on both ends, water supply at 125 psi. Hose clamps + rubber seals on DWV.
*[https://youtu.be/oP17jzfq_HE?t=256 here] there is a water fill of vent pipe - via water outlet of washer machine going into vent system? Is water testing required for vents? Or does air suffice? For water heater testing - supply/exit pipe is short circuited [https://youtu.be/oP17jzfq_HE?t=368 here]. Toilet flange must have corrosion resistant screws, and all screws must be filled [https://youtu.be/oP17jzfq_HE?t=392].
*[https://youtu.be/oP17jzfq_HE?t=256 here] there is a water fill of vent pipe - via water outlet of washer machine going into vent system? Is water testing required for vents? Or does air suffice? For water heater testing - supply/exit pipe is short circuited [https://youtu.be/oP17jzfq_HE?t=368 here]. Toilet flange must have corrosion resistant screws, and all screws must be filled [https://youtu.be/oP17jzfq_HE?t=392]. Tub shower is already installed - pipes hidden [https://youtu.be/oP17jzfq_HE?t=411]. Vent cross section totals house drain cross section [https://youtu.be/oP17jzfq_HE?t=557]

Latest revision as of 01:10, 29 March 2022

Rough Plumbing

  • https://www.youtube.com/watch?v=JKzca-Hqurw - pressure on waste at 5 psi sealed on both ends, water supply at 125 psi. Hose clamps + rubber seals on DWV.
  • here there is a water fill of vent pipe - via water outlet of washer machine going into vent system? Is water testing required for vents? Or does air suffice? For water heater testing - supply/exit pipe is short circuited here. Toilet flange must have corrosion resistant screws, and all screws must be filled [1]. Tub shower is already installed - pipes hidden [2]. Vent cross section totals house drain cross section [3]