Foundation Inspection: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 3: | Line 3: | ||
<html><iframe width="560" height="315" src="https://www.youtube.com/embed/OFv3k5Gine4" title="YouTube video player" frameborder="0" allow="accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture" allowfullscreen></iframe></html> | <html><iframe width="560" height="315" src="https://www.youtube.com/embed/OFv3k5Gine4" title="YouTube video player" frameborder="0" allow="accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture" allowfullscreen></iframe></html> | ||
**Ufer ground - 20' rebar + copper wire 6"+ above floor level | **Ufer ground - 20' rebar + copper wire 6"+ above floor level | ||
=Pipe Fix= | |||
*Camera + vacuum can see leaks in drain tubing: | |||
<html><iframe width="560" height="315" src="https://www.youtube.com/embed/NaZYjPFdIeU" title="YouTube video player" frameborder="0" allow="accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture" allowfullscreen></iframe></html> |
Latest revision as of 00:17, 16 October 2022
- Good video:
- Ufer ground - 20' rebar + copper wire 6"+ above floor level
Pipe Fix
- Camera + vacuum can see leaks in drain tubing: