Tub Drainage RLF Module: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
No edit summary
 
(One intermediate revision by the same user not shown)
Line 4: Line 4:
Steps:
Steps:
#Attach overflow on top of tub, washer outside.
#Attach overflow on top of tub, washer outside.
#Attach bottom overflow, washer outside. Point - overflow side holds the bottom overflow in place - so this can be done with one person instead of two people on each side of tub.
#Attach bottom overflow, washer outside. Point - overflow side holds the bottom overflow in place - so this can be done with one person instead of two people on each side of tub. The overflow holds the bottom overflow - so it can be tightened with pliers from the inside of the tub.
#However - next modify to solid PVC for unserviceable locations.

Latest revision as of 03:39, 13 October 2025

Tub Overflow Assembly Order

Order video -[1]

Steps:

  1. Attach overflow on top of tub, washer outside.
  2. Attach bottom overflow, washer outside. Point - overflow side holds the bottom overflow in place - so this can be done with one person instead of two people on each side of tub. The overflow holds the bottom overflow - so it can be tightened with pliers from the inside of the tub.
  3. However - next modify to solid PVC for unserviceable locations.