OSE Program in Civilization Systems Engineering: Difference between revisions
Jump to navigation
Jump to search
(Created page with "The only way this becomes real to the completion of the GVCS by end of 2028 is if a proper OSPD method is developed. Now, see FBA.") |
No edit summary |
||
| Line 1: | Line 1: | ||
The only way this becomes real to the completion of the [[GVCS]] by end of 2028 is if a proper [[OSPD]] method is developed. | The only way this becomes real to the completion of the [[GVCS]] by end of 2028 is if a proper [[OSPD]] method is developed. | ||
Now, see [[FBA]]. | Now, see [[FBA]] and [[Civilization Systems Engineering]]. | ||
Latest revision as of 21:55, 11 January 2026
The only way this becomes real to the completion of the GVCS by end of 2028 is if a proper OSPD method is developed.
Now, see FBA and Civilization Systems Engineering.