GAIA Cornell Daily Log: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
|||
| (8 intermediate revisions by the same user not shown) | |||
| Line 9: | Line 9: | ||
|image = [[File:check.png|200px|alt=Example alt text]] | |image = [[File:check.png|200px|alt=Example alt text]] | ||
|imagestyle = | |imagestyle = | ||
|caption = | |caption = 20V brushless cordless drill — open hardware design | ||
|captionstyle = | |captionstyle = | ||
|headerstyle = background:#ccf; | |headerstyle = background:#ccf; | ||
| Line 16: | Line 16: | ||
|header1 = Specifications | |header1 = Specifications | ||
|label1 = | |label1 = | ||
|data1 = | |data1 = | ||
|header2 = | |header2 = | ||
|label2 = Product Ecology | |label2 = Product Ecology | ||
|data2 = | |data2 = [[Workbench]], [[Power Supply]], [[Battery System]], [[CNC Torch Table]] | ||
|header3 = | |header3 = | ||
|label3 = License | |label3 = License | ||
|data3 = [[OSHWA]] and [[OSI]] compliant. CC-BY-SA-4.0 International, GPLv3, [[DIN SPEC 3105]]. | |data3 = [[OSHWA]] and [[OSI]] compliant. CC-BY-SA-4.0 International, GPLv3, [[DIN SPEC 3105]]. | ||
|header4 = | |header4 = | ||
|label4 = Module | |label4 = Motor Module | ||
|data4 = | |data4 = 20V brushless DC motor; supports variable speed via PWM trigger | ||
|header5 = | |header5 = | ||
|label5 = Module | |label5 = Gearbox Module | ||
|data5 = | |data5 = 2-speed planetary gearbox; 3/8" keyless chuck | ||
|header6 = | |header6 = | ||
|label6 = Key Specification | |label6 = Key Specification | ||
|data6 = | |data6 = 18V Li-ion, 400 in-lbs torque, 0–1500 / 0–400 RPM dual speed | ||
|header7 = | |header7 = | ||
|label7 = Construction | |label7 = Construction | ||
|data7 = | |data7 = 3D-printed housing (PETG/PLA); off-the-shelf motor, gearbox, and trigger components | ||
|header8 = | |header8 = | ||
|label8 = Productivity | |label8 = Productivity | ||
|data8 = | |data8 = Replaces a $80–150 commercial drill; fabricable in a village workshop with basic tools | ||
|header9 = Completion Status | |header9 = Completion Status | ||
|label9 = | |label9 = | ||
| Line 44: | Line 44: | ||
|header10 = | |header10 = | ||
|label10 = | |label10 = | ||
|data10 = | |data10 = Prototype assembled Mar 2026; motor bench-tested Jun 2026. See [[Genealogy]] and [[Status of Completion]]. | ||
|belowstyle = background:#ddf; | |belowstyle = background:#ddf; | ||
| Line 52: | Line 50: | ||
}} | }} | ||
|} | |} | ||
== Sun Jun 15, 2026 == | |||
=== Meeting Summary === | |||
Jumping in hard on design work. Split into teams to work on different design aspects. The electrical team worked on battery needs and wiring. Mechanical team split into teams working on direction control switch, motor/gearbox housing, and handle/pcb housing. | |||
=== Completed Tasks === | |||
* Ordered remaining electrical parts | |||
=== TODO === | |||
* Continue design work | |||
* Make rapid prototypes (Print! Print! Print!) | |||
=== Related Pages === | |||
* [[Drill Initial Design Research]] | |||
== Sun Jun 8, 2026 == | |||
=== Meeting Summary === | |||
Motor components arrived and were tested on the lab bench. | |||
=== Completed Tasks === | |||
* Research battery and energy constraints | |||
=== TODO === | |||
* Purchase battery and an initial adapter for rapid prototyping | |||
* Design and build a proper adapter later | |||
=== Related Pages === | |||
* [[Drill Battery Research]] | |||
== Sun Mar 1, 2026 == | |||
=== Meeting Summary === | |||
First meeting with the full team. We researched design constraints and began assembling a **bill of materials** for the prototype. | |||
=== Completed Tasks === | |||
Purchases for: | |||
* Motor ✓ | |||
* Trigger ✓ | |||
* Gearbox ✓ | |||
* Chuck ✓ | |||
=== TODO === | |||
* Find and purchase initial parts for testing | |||
* Break into more concrete subteams: | |||
** Mechanical | |||
** Electrical | |||
** CAD | |||
=== Related Pages === | |||
* [[Initial Part Research]] | |||
* [[Drill Bill of Materials]] | |||
Latest revision as of 22:52, 18 March 2026
| ||||||||||||||||||||||||||
Sun Jun 15, 2026
Meeting Summary
Jumping in hard on design work. Split into teams to work on different design aspects. The electrical team worked on battery needs and wiring. Mechanical team split into teams working on direction control switch, motor/gearbox housing, and handle/pcb housing.
Completed Tasks
- Ordered remaining electrical parts
TODO
- Continue design work
- Make rapid prototypes (Print! Print! Print!)
Related Pages
Sun Jun 8, 2026
Meeting Summary
Motor components arrived and were tested on the lab bench.
Completed Tasks
- Research battery and energy constraints
TODO
- Purchase battery and an initial adapter for rapid prototyping
- Design and build a proper adapter later
Related Pages
Sun Mar 1, 2026
Meeting Summary
First meeting with the full team. We researched design constraints and began assembling a **bill of materials** for the prototype.
Completed Tasks
Purchases for:
- Motor ✓
- Trigger ✓
- Gearbox ✓
- Chuck ✓
TODO
- Find and purchase initial parts for testing
- Break into more concrete subteams:
- Mechanical
- Electrical
- CAD
