==ASSEMBLY SHEET FOR WORKSHOP ROOF FRAMES==
* Assemble supplies and tools:
** Each Frame requires (11) 16’ 2x6” boards.
**2-1/2 large tubes of Liquid Nails for each assembly
**Large caulking gun(s)
**3" deck nails
**Carpenter's square
**(2) 25' tape measures
**Power screw driver(s)
* Lay out boards according to diagram, spacing 9 boards 2 feet apart.
* Butt each board to the two perpendicular ones, fastening with glue and screws according to diagram.
* Verify square by checking that both diagonals are the same.
* Maintain square by attaching lath or other scrap lumber diagonally across the frame.
Build 24 roof frame assemblies
[[File:Roof assembly layout.png]]
==ASSEMBLY SHEET FOR WORKSHOP ROOF STRINGERS==
==ASSEMBLY SHEET FOR WORKSHOP ROOF STRINGERS==
* Cut one 16’ 2x6” beam to create one 10’8” piece and one 5’4” piece
* Assemble supplies and tools:
* Cut one 16’ 2x6” beam to create one 10’ piece and one 6’ piece
**(14)2x6"x16' beams for each set of assemblies.
*Cut two 16’ 2x6” beams to create two 11’ pieces and two 5’ pieces
**2-1/2 large tubes of Liquid Nails for each assembly
*Cut one 16’ 2x6” beams to 14’ in length.
**Large caulking gun(s)
*Cut a diagonal piece off one 11’ piece and one full 16’ piece as shown.
**3" deck nails
*Lay out a 32’ assembly as shown in the diagram
**Circular saw
*Spread glue on the 5-1/2” faces and screw together as shown in the detail at about 18” intervals.
**Power source
*Lay out a 43” assembly as shown in the diagram.
**Pencil
*Spread glue on the 5-1/2” faces and screw together as shown in the detail at about 18” intervals.
**Tape measure (50')
**Carpenter's square
**Power screw drivers
**Clamps (>5")
**Saw horses
* Measure and mark each of the following beams
**Next to the cut line mark the size of the board on that side of the line
* One 16’ 2x6” beam to create one 10’8” piece and one 5’4” piece
* One 16’ 2x6” beam to create one 10’ piece and one 6’7/8" piece
* Two 16’ 2x6” beams to create two 11’7/8" pieces and two 5’ pieces
* One 16’ 2x6” beam at 15’ in length (cut off 1'7/8").
* One 16’ 2x6” beam with a diagonal 1'9-7/8" from one end.
* One of the 11'7/8" pieces with a diagonal 1'9-7/8" from one end
* Cut the marked pieces.
* Lay out a 32’ assembly as shown in the diagram
* Start 2 screws at the end of each outside beam piece.
* Spread glue on one 5-1/2” face of the center beam pieces.
* Set one set of outside beams on the glued pieces.
* Clamp at each beam end and screw together as shown in the detail, adding more screws at about 18” intervals.
* Turn the assembly over and spread glue on the other 5-1/2" face of the center beam pieces.
* Set the other set of outside beams on the glued pieces.
* Clamp at each beam end and screw together as shown in the detail, adding more screws at about 18” intervals.


Make 5 of each assembly
* Lay out a 43”6-1/2" assembly as shown in the diagram.
* Start 2 screws at the end of each outside beam piece.
* Spread glue on one 5-1/2” face of the center beam pieces.
* Set one set of outside beams on the glued pieces.
* Clamp at each beam end and screw together as shown in the detail, adding more screws at about 18” intervals.
* Turn the assembly over and spread glue on the other 5-1/2" face of the center beam pieces.
* Set the other set of outside beams on the glued pieces. Be sure the points of the diagonal cuts are on the same side of the stringer.
* Clamp at each beam end and screw together as shown in the detail, adding more screws at about 18” intervals.


Make (5) 32" workshop assemblies and (5) 43"6-1/2" assemblies.


==ASSEMBLY SHEET FOR SUPPLY SHED ROOF STRINGERS==
==ASSEMBLY SHEET FOR SUPPLY SHED ROOF STRINGERS==
*Cut four 16’ 2x6” beams to create four 10’8” pieces and four 5’4” pieces.
* Assemble supplies and tools:
*Lay out a supply shed stringer assembly as shown in the diagram.
**(6)2x6"x16' beams for each set of assemblies.
*Spread glue on the 5-1/2” faces and screw together as shown in the detail at about 18” intervals.
**1 large tubes of Liquid Nails for each assembly
**3" deck nails
**Circular saw
**Power source
**Pencil
**Tape measure
**Carpenter's square
**Power screw drivers
**Clamps (>5")
**Saw horses
* Measure and mark the following beams
**Next to the cut line mark the size of the board on that side of the line
* Two 16’ 2x6” beam to create two 10’8” pieces and twoe 5’4” pieces.
* Lay out a supply shed stringer assembly as shown in the diagram.
* Start 2 screws at the end of each outside beam piece.  
* Spread glue on one 5-1/2” face of the center beam pieces.
* Set one set of outside beams on the glued pieces.
* Clamp at each beam end and screw together as shown in the detail, adding more screws at about 18” intervals.
* Turn the assembly over and spread glue on the other 5-1/2" face of the center beam pieces.
* Set the other set of outside beams on the glued pieces.
* Clamp at each beam end and screw together as shown in the detail, adding more screws at about 18” intervals.
 
Make 2 assemblies.


   
   




[[File:RoofStringers.png]]
[[File:Roof Stringers.png]]
==ROOF TIE ASSEMBLY SHEET==
 
==TYING STRINGERS TO COLUMNS ASSEMBLY SHEET==
 
==ROOF ASSEMBLY SHEET==
 
==ROOF PANELS ASSEMBLY SHEET==

Latest revision as of 02:01, 16 September 2011

ASSEMBLY SHEET FOR WORKSHOP ROOF FRAMES

  • Assemble supplies and tools:
    • Each Frame requires (11) 16’ 2x6” boards.
    • 2-1/2 large tubes of Liquid Nails for each assembly
    • Large caulking gun(s)
    • 3" deck nails
    • Carpenter's square
    • (2) 25' tape measures
    • Power screw driver(s)
  • Lay out boards according to diagram, spacing 9 boards 2 feet apart.
  • Butt each board to the two perpendicular ones, fastening with glue and screws according to diagram.
  • Verify square by checking that both diagonals are the same.
  • Maintain square by attaching lath or other scrap lumber diagonally across the frame.

Build 24 roof frame assemblies Roof assembly layout.png

ASSEMBLY SHEET FOR WORKSHOP ROOF STRINGERS

  • Assemble supplies and tools:
    • (14)2x6"x16' beams for each set of assemblies.
    • 2-1/2 large tubes of Liquid Nails for each assembly
    • Large caulking gun(s)
    • 3" deck nails
    • Circular saw
    • Power source
    • Pencil
    • Tape measure (50')
    • Carpenter's square
    • Power screw drivers
    • Clamps (>5")
    • Saw horses
  • Measure and mark each of the following beams
    • Next to the cut line mark the size of the board on that side of the line
  • One 16’ 2x6” beam to create one 10’8” piece and one 5’4” piece
  • One 16’ 2x6” beam to create one 10’ piece and one 6’7/8" piece
  • Two 16’ 2x6” beams to create two 11’7/8" pieces and two 5’ pieces
  • One 16’ 2x6” beam at 15’ in length (cut off 1'7/8").
  • One 16’ 2x6” beam with a diagonal 1'9-7/8" from one end.
  • One of the 11'7/8" pieces with a diagonal 1'9-7/8" from one end
  • Cut the marked pieces.
  • Lay out a 32’ assembly as shown in the diagram
  • Start 2 screws at the end of each outside beam piece.
  • Spread glue on one 5-1/2” face of the center beam pieces.
  • Set one set of outside beams on the glued pieces.
  • Clamp at each beam end and screw together as shown in the detail, adding more screws at about 18” intervals.
  • Turn the assembly over and spread glue on the other 5-1/2" face of the center beam pieces.
  • Set the other set of outside beams on the glued pieces.
  • Clamp at each beam end and screw together as shown in the detail, adding more screws at about 18” intervals.
  • Lay out a 43”6-1/2" assembly as shown in the diagram.
  • Start 2 screws at the end of each outside beam piece.
  • Spread glue on one 5-1/2” face of the center beam pieces.
  • Set one set of outside beams on the glued pieces.
  • Clamp at each beam end and screw together as shown in the detail, adding more screws at about 18” intervals.
  • Turn the assembly over and spread glue on the other 5-1/2" face of the center beam pieces.
  • Set the other set of outside beams on the glued pieces. Be sure the points of the diagonal cuts are on the same side of the stringer.
  • Clamp at each beam end and screw together as shown in the detail, adding more screws at about 18” intervals.

Make (5) 32" workshop assemblies and (5) 43"6-1/2" assemblies.

ASSEMBLY SHEET FOR SUPPLY SHED ROOF STRINGERS

  • Assemble supplies and tools:
    • (6)2x6"x16' beams for each set of assemblies.
    • 1 large tubes of Liquid Nails for each assembly
    • 3" deck nails
    • Circular saw
    • Power source
    • Pencil
    • Tape measure
    • Carpenter's square
    • Power screw drivers
    • Clamps (>5")
    • Saw horses
  • Measure and mark the following beams
    • Next to the cut line mark the size of the board on that side of the line
  • Two 16’ 2x6” beam to create two 10’8” pieces and twoe 5’4” pieces.
  • Lay out a supply shed stringer assembly as shown in the diagram.
  • Start 2 screws at the end of each outside beam piece.
  • Spread glue on one 5-1/2” face of the center beam pieces.
  • Set one set of outside beams on the glued pieces.
  • Clamp at each beam end and screw together as shown in the detail, adding more screws at about 18” intervals.
  • Turn the assembly over and spread glue on the other 5-1/2" face of the center beam pieces.
  • Set the other set of outside beams on the glued pieces.
  • Clamp at each beam end and screw together as shown in the detail, adding more screws at about 18” intervals.

Make 2 assemblies.



Roof Stringers.png

ROOF TIE ASSEMBLY SHEET

TYING STRINGERS TO COLUMNS ASSEMBLY SHEET

ROOF ASSEMBLY SHEET

ROOF PANELS ASSEMBLY SHEET