Extreme Manufacturing Review Team: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
(2 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
Last Updated March 8, 2012 | Last Updated March 8, 2012 | ||
The review team has the duty of performing ongoing review of | The review team has the duty of performing ongoing review of designs for GVCS machines. | ||
The point of this is to ensure that designs follow | The point of this is to ensure that designs follow modularity and product ecology (modules are interchangeable as part of a greater set). | ||
=Links= | |||
*[[Technical Review Team Guidelines]] | |||
* | |||
[[Category:Extreme Manufacturing]] | [[Category:Extreme Manufacturing]] |
Latest revision as of 11:43, 2 April 2013
Last Updated March 8, 2012
The review team has the duty of performing ongoing review of designs for GVCS machines.
The point of this is to ensure that designs follow modularity and product ecology (modules are interchangeable as part of a greater set).