XM: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
(Redirected page to Extreme Manufacturing)
 
(7 intermediate revisions by the same user not shown)
Line 1: Line 1:
=Extreme Manufacturing Notes=
#Redirect [[Extreme Manufacturing]]
 
See [[Extreme Manufacturing]] and [[Scrum]]
 
*If design is separated from build, cost increases - with reference to [[Open Capitalist Platform]]. How to incorporate rapid delivery into Open Capitalist Platform.
*Assure integration via [[Contract-First Manufacturing]] (CFM)
**Example of excellent interface - [little bits - http://littlebits.cc/]
*Process: Breakdown -> CFM -> Test-Driven Manufacturing (TDM)
**TDM=Before any prototyping occurs, a test is defined to measure success of that prototyping
*MMF - Minimum Marketable Feature. Minimum definition required for beginning of development.
*Definition of Ready - definition of MMF. Ex. Replication of Wikispeed Car
*Definition of Done - Definition of project 'end' (constant evolution happens, so there is never an 'end' in open source development. Ex: 100mpg equivalent 2 passenger pelletized biomass-fueled Wikispeed car
 
==Meta==
*Process can be adabpted to all parts of development process for the Open Source Economy:
**Organizational infrastructure
**Advisory Board development
**Strategic Development
**Development of one of 50 technologies
**Factor e Farm development
***Land Stewardship
***Production
***Post-scarcity village development
**Global Collaboration Development
**Resource Development
**Recruiting
**Lean Platform Development
*Before project starts - stake holder defines MMF and recruits Scrum Master. For scalability, an Organization is set up to facilitate a generalized XM platform - an organization for open hardware as Wikimedia Foundation is to open knowledge.
 
=Diagram=
 
<html><img src="https://docs.google.com/drawings/pub?id=1LfaTjD41qFkCN7j_Opl8AvMWixz38rDrw447EwDJcdw&amp;w=960&amp;h=720"></html>
 
 
[[Category:XM]]

Latest revision as of 23:03, 10 March 2012