Define Performance Metrics: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
(→Other) |
||
(2 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
*Number of Prototypes Built (24), Number of Unique Prototypes Build (15), Beta Releases (4), and Full Product Releases (0) | *Number of Prototypes Built (24), Number of Unique Prototypes Build (15), Beta Releases (4), and Full Product Releases (0) | ||
*Number of machines replicated independently (8) | *Number of machines replicated independently (8) | ||
* | *Total sales volume of GVCS Machines ($45k) | ||
*Funding level ($450k for next 10 months, graph of overall) | *Size of permanent staff and volunteers on site | ||
*Funding level ($450k for next 10 months, graph of overall funding) | |||
*Technical Blog Posts (prototype builds) | *Technical Blog Posts (prototype builds) | ||
*Control Panel Steps Completed per project (needs to organize Control Panel) | *Control Panel Steps Completed per project (needs to organize Control Panel) | ||
*Prototypes/month development rate by OSE Headquarters | *Prototypes/month development rate by OSE Headquarters | ||
*Flash Mob member numbers | *Flash Mob member numbers | ||
=Other= | =Other= | ||
Line 18: | Line 18: | ||
*money spent per prototype built | *money spent per prototype built | ||
*money spent per Distributive Enterprise | *money spent per Distributive Enterprise | ||
*Earnings | *Earnings, Donations, Grants | ||
*Loal Food produced on site | *Loal Food produced on site | ||
*Local Energy Produced On Site - kW-Hr/month | *Local Energy Produced On Site - kW-Hr/month | ||
*Web hits - main site, wiki, blog, TED Talk | *Web hits - main site, wiki, blog, TED Talk |
Latest revision as of 13:01, 3 September 2012
Core
- Number of Prototypes Built (24), Number of Unique Prototypes Build (15), Beta Releases (4), and Full Product Releases (0)
- Number of machines replicated independently (8)
- Total sales volume of GVCS Machines ($45k)
- Size of permanent staff and volunteers on site
- Funding level ($450k for next 10 months, graph of overall funding)
- Technical Blog Posts (prototype builds)
- Control Panel Steps Completed per project (needs to organize Control Panel)
- Prototypes/month development rate by OSE Headquarters
- Flash Mob member numbers
Other
- Publicity and Honors attained
- Number of wiki edits by top 10 contributors
- TF numbers
- Twitter, FB followers
- YouTube subscribers, views
- money spent per prototype built
- money spent per Distributive Enterprise
- Earnings, Donations, Grants
- Loal Food produced on site
- Local Energy Produced On Site - kW-Hr/month
- Web hits - main site, wiki, blog, TED Talk