Yoonseo Log: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
No edit summary
 
(20 intermediate revisions by the same user not shown)
Line 1: Line 1:
=Future=
'''Left OSE on February 2013 in the aftermath of Nov 2012 conflict arising from zero sharing of CEB Press production profits, and also due in part by certain behaviour and comments by Marcin. Now starting an open hardware business - Open Tech Forever.''' [[User:YK|YK]] ([[User talk:YK|talk]]) 18:53, 19 February 2013 (CET)


=Past=


[http://opensourceecology.org/wiki/Yoonseo_Log_1_2013 Yoonseo Log 1/2013]


[[Yoonseo Backlog]]
[http://opensourceecology.org/wiki/Yoonseo_Log_12_2012 Yoonseo Log 12/2012]
 
=December 2012=
 
==27==
 
Shaking off remainder of sickness...
 
Preparing for trip to Barry's for troubleshooting CEB electronics.
 
==26==
 
The stove is ridiculous. Much time and frustration. Leaks and handle and non-starting and all.
 
Better stove = no leaks, forward/backward oriented grate, reliable handle.
 
Still recovering from sickness...
 
==25==
 
Defending against sickness.
 
Successful fire start number 1. The big log does not fire. Gotta somehow cut the large diameter wood down to a more appropriate size. Table saw? Portable saw? Having the mitre saw in front of Hablab works wonders for smaller wood. Tomorrow will try chopping with axe with stone underneath the log.
 
Somehow made progress on [[Tech Development]] plan despite being sickly.
 
==24==
 
Adding categories to [[Tech Development]] Outline - [[Development Guide]]
 
Lots of trouble maintaining the fire - non-straightforward, super-leaky stove, terrible terrible.
 
==23==
 
Got truck running - removed some unnecessary electronics.
 
Got truck unstuck from mud- lined wheels with gravel and put gravel in front and back of rear wheels, then moved forward and backward until the gravel was well-lined into the wheel.
 
Picked up wood.
 
Responded to Wilson about agricultural project in India looking for collaboration
 
Progress on 2013 plan - [[Tech Development]]
 
==22==
 
Faxed driver's abstract to GEICO.
 
Started [[Tech Development]] as development scope with project granularization and timeline
 
Remember to get expanding foam from baker's or other local store.
 
==21==
 
Got Auto Insurance. Need to get and fax US driver's license and ontario driver's abstract to geico
 
Need to transfer vehicle under my name. Got non-assessment card. Truck needs inspection- call D-tone on Monday.
 
Need to take written and driving test at Maysville center on Thursday.
 
Got driver's abstract.
 
http://www.ontario.ca/driving-and-roads/uncertified-drivers-record
 
Research US tax process
 
http://www.irs.gov/uac/Free-File:-Do-Your-Federal-Taxes-for-Free
 
http://www.youtube.com/watch?annotation_id=annotation_286660&feature=iv&src_vid=mq7rkCcXkPk&v=MOIGaCaNnfM
 
==20==
 
Applied for Auto Insurance... Talk to Maysville Local Insurance; if local insurance not good, call GEICO to finalize application
 
Researching US driver's license process... Call the Maysville licensing office again
 
Remember to transfer the vehicle under my name
 
Sealed door-side air gap at back of Hablab
 
Project Plan/Contract Discussion with Marcin
 
Working on Project Plan and Contract... Contract Draft 1 Complete. Project Plan Draft 1 Complete.
 
Progress on [[Development Guide]] - [[Assembly Mechanisms]] , [[Forming Mechanisms]]
 
TODO:
 
*Locate Plasma Cutter and Move to Torch Table
*Locate Gas Air Compressor and Move to Torch Table
*Connect Gas Compressor to Plasma Cutter
*Mount Plasma Cutter to Torch Table
*Clean and Organize Electronics Zone
*Assess CNC Electronics inventory
*Design CNC Electronics Mounting/Wiring Strategy
*Mount Steppers to CNC Case
*Wire CNC Case
*Wire CNC Electronics to Torch Table
 
==19==
 
Completed and Tested CEB Press Coded Arduino Board for Barry. Kavitha is taking care of shipping.
 
Room organizing.
 
Ordered some hand tools.
 
Getting ready for some post-organization [[CNC Torch Table]] rapid development. Straightforwardness is the key, baby!
 
Alas, there's a lot of workshop organization, tool acquisition, and supplier searching to be done.
 
C-Clamps should be made with flat perpendicular faces so that mounting C-Clamps on C-Clamps is easier. Plus flat faces make add-ons easier like welding on a linear rail. Oo, Fancy!
 
Ah, gotta do the truck legal stuff too.
 
==18==
 
Well, editing the wiki is so darn accessible. I'm going to try wiki-logging again.
 
[[CEB Press]] 1-Day Production Run
 
[[Development Guide]] is trudging along
 
Various tools still need to be ordered
 
Workshop needs to be cleaned up and super organized
 
Lead Free Brass Fitting and Fuse Holder order is still waiting on Marcin's response...
 
=Past=
 
[http://opensourceecology.org/wiki/Yoonseo_Log_2012 Yoonseo Log 2012]


[http://opensourceecology.org/wiki/Yoonseo_Log_11_2012 Yoonseo Log 11/2012]
[http://opensourceecology.org/wiki/Yoonseo_Log_11_2012 Yoonseo Log 11/2012]

Latest revision as of 17:53, 19 February 2013

Left OSE on February 2013 in the aftermath of Nov 2012 conflict arising from zero sharing of CEB Press production profits, and also due in part by certain behaviour and comments by Marcin. Now starting an open hardware business - Open Tech Forever. YK (talk) 18:53, 19 February 2013 (CET)

Past

Yoonseo Log 1/2013

Yoonseo Log 12/2012

Yoonseo Log 11/2012

Yoonseo Log 10/2012

Yoonseo Log <2/2012