OSE Production Status: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
(Created page with "We have recruited an Executive Core Team as of May, 2013.")
 
No edit summary
 
Line 1: Line 1:
We have recruited an [[Executive Core Team]] as of May, 2013.
We have recruited an [[Executive Core Team]] as of May, 2013. In June-July - we are on-boarding our team and coming up to speed to establish a new level of productivity at OSE. As we stabilize our operations, the immediate points of development include:
 
#Developing pilot projects to go the last mile in quality control of our tools under the most demanding and diverse field testing conditions
#Developing fundraising capacity to assure a funding base to retain existing staff and to grow the core team to a few more key positions
#Developing production capacity after deploying the CNC Torch Table as a key element of digital fabrication
#Developing strategic partnerships towards reaching the main milestone of 2013: demonstrating that we can design a single, complex machine in a single day with the collaboration of 250 realtime developers

Latest revision as of 23:10, 7 June 2013

We have recruited an Executive Core Team as of May, 2013. In June-July - we are on-boarding our team and coming up to speed to establish a new level of productivity at OSE. As we stabilize our operations, the immediate points of development include:

  1. Developing pilot projects to go the last mile in quality control of our tools under the most demanding and diverse field testing conditions
  2. Developing fundraising capacity to assure a funding base to retain existing staff and to grow the core team to a few more key positions
  3. Developing production capacity after deploying the CNC Torch Table as a key element of digital fabrication
  4. Developing strategic partnerships towards reaching the main milestone of 2013: demonstrating that we can design a single, complex machine in a single day with the collaboration of 250 realtime developers