James Slade Log: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
No edit summary
Line 1: Line 1:
=Wed August 7 2013=
=Tue Aug 6 2013=  
=Tue Aug 6 2013=  


Line 32: Line 34:
*http://www.ladyada.net/library/pcb/manufacturers.html
*http://www.ladyada.net/library/pcb/manufacturers.html


=Sunday 4 2013=  
=Sunday August 4 2013=  
=PCB designs=
=PCB designs=
Sitting down and looking into PCB design for the CEB's. These will be professionally made to save time and also designed to be robust enough for outdoor, all weather use.
Sitting down and looking into PCB design for the CEB's. These will be professionally made to save time and also designed to be robust enough for outdoor, all weather use.
Line 38: Line 40:
2 hours
2 hours


=Saturday 3 2013=  
=Saturday August 3 2013=  
=Log Start=
=Log Start=
*Evaluate current requests from FeF and determine cost, time, and workflow
*Evaluate current requests from FeF and determine cost, time, and workflow

Revision as of 23:26, 7 August 2013

Wed August 7 2013

Tue Aug 6 2013

edit


PCB Design

Design Rationale for Zach's CEB Controller -

  • Switch from automatic to manual mode - toggle
  • For drawer - you calibrate it and move it a certain percentage.
  • For drawer - end positions via pressure sensor
  • Replace pause with auto/manual switch


PCB of Board - [11]

Sunday August 4 2013

PCB designs

Sitting down and looking into PCB design for the CEB's. These will be professionally made to save time and also designed to be robust enough for outdoor, all weather use.

2 hours

Saturday August 3 2013

Log Start

  • Evaluate current requests from FeF and determine cost, time, and workflow
  • Setup Log

Had a late day getting started as there were unexpected issues here in moving my truck from Creation Flame to a shop in town. This will become 1983 Chevy Blazer 6.2 diesel mobile 4x4 power cube with a turbo. :)

Time Log

Time Sheet