11th March, 2014
Drew the clamshell mechanism and hinge in sketch up for the Soil Mixer.
Tested different whitewash formula. it appeared that thick lime wash was less tolerant of some areas of the wall and was peeling back at some points after some time had passed. We applied a thin whitewash with the consistency of cream or milk at the end to different parts of the wall to see if we could avoid the peeling problem.
https://www.youtube.com/watch?v=KjADHmrkFy4
Screenshot http://opensourceecology.org/wiki/File:WIPsoild_mixer_and_lid.png
Sketchup in progress File:SoilPulverizerV1s001.skp
10th March, 2014
Timelapse of wall painting- https://www.youtube.com/watch?v=o4bef_KFQts
Helped sketch designs for soil mixer.
Painted wall with Lauren and Cat. (timelapse video in progress)
Cooked thai style fried rice for dinner.
Commenced ideation for procedural animation of the GVCS in Houdini for documentation.
9th March, 2014
Append design Rationale - http://opensourceecology.org/wiki/Soil_Mixer_Construction_Set_Requirements
Laid hay over the ground to stop mud being moved along the path.