Greg Log: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 1: | Line 1: | ||
=2014 June 10 Tuesday= | |||
*Presented 3D printing results at morning meeting | |||
*Began work on CEB Press .SKP | |||
=2014 June 9 Monday= | =2014 June 9 Monday= | ||
Line 6: | Line 8: | ||
*Oriented self to basic CEB Press operation, brick compression process | *Oriented self to basic CEB Press operation, brick compression process | ||
*Swarmed on getting 3D printers up and running - worked on HYDRA Lulzbot. Got it connected to computer, leveled printbed pretty well. Ran into troubles with .gcode files - printer randomly stops prematurely, causing print to fail. Looks like Colten had similar troubles: [[Colten Jackson Log]] | *Swarmed on getting 3D printers up and running - worked on HYDRA Lulzbot. Got it connected to computer, leveled printbed pretty well. Ran into troubles with .gcode files - printer randomly stops prematurely, causing print to fail. Looks like Colten had similar troubles: [[Colten Jackson Log]] | ||
*Successfully printed an Octopus on the TAZ out of pink PLA plastic: | |||
[[File:3D print PLA Octopus.jpg|540px]] | |||
=2014 June 8 Sunday= | =2014 June 8 Sunday= | ||
Arrived at Factor-e Farm. Got settled in, setup living situation, met team. | Arrived at Factor-e Farm. Got settled in, setup living situation, met team. |
Revision as of 14:49, 10 June 2014
2014 June 10 Tuesday
- Presented 3D printing results at morning meeting
- Began work on CEB Press .SKP
2014 June 9 Monday
- First day of work. Attended orientation, began worklog, hit the ground running.
- Worked on CEB Press Drawer Module documentation
- Oriented self to basic CEB Press operation, brick compression process
- Swarmed on getting 3D printers up and running - worked on HYDRA Lulzbot. Got it connected to computer, leveled printbed pretty well. Ran into troubles with .gcode files - printer randomly stops prematurely, causing print to fail. Looks like Colten had similar troubles: Colten Jackson Log
- Successfully printed an Octopus on the TAZ out of pink PLA plastic:
2014 June 8 Sunday
Arrived at Factor-e Farm. Got settled in, setup living situation, met team.