Gabriel Kind log: Difference between revisions
Jump to navigation
Jump to search
Gabriel Kind (talk | contribs) No edit summary |
Gabriel Kind (talk | contribs) No edit summary |
||
Line 1: | Line 1: | ||
==June 23== | ==June 23== | ||
Added a tut on the [[GIMP]] page | *Added a tut on the [[GIMP]] page | ||
*Added a tutorial to download the latest version of [[FreeCAD]] | |||
==June 20== | ==June 20== |
Revision as of 15:56, 23 June 2014
June 23
June 20
- Built silk screen frame and scoop cup
June 19
- Weeded
- Moved supplies from solar house
- Applied a layer of paint to the bottom
June 18
- Applied two layers of stain to the solar house siding
- Went dumpster diving in St. Joseph for screen printing supplies
June 17
- Finished side paneling on the solar house
- Picked up supplies for screen printed shirts
June 16
- Helped to load van
- Took stock of CEB press pieces
- Fastened side paneling to the sun house
- Picked up food supplies, wood finish, more paneling etc
June 14
- Puked and slept
June 13=
- Puked and slept
June 12
- Made changes to grate instructional
- Did research on visual VC and alternative CAD programs and formats
- Built automatic gcode modification into LasersaurApp and explored the code. Thoroughly.
June 11
- Created an instructional for the Grate deflector module
- Fixed the HyrdaFabber 3D printer-- flashed the firmware, cleaned the hotend, re-wound the spool and re-leveled the bed.
June 10
- Worked to level the Ultimaker 3d printer
- Got pronterface working on Linux
- Unpacked pool parts and began to take inventory
- Augmented the pool assembly instructional
June 9
- Moved pool parts
- Assisted in torch table configuration
June 8
- Penetration test of CNC torch table
- Continued through KiCad Tutorials
- Continued devpage dozuki scraper
June 7
- Worked through KiCad tutorials
- Documented and assisted power cube dis-assembly
- Built automated web scraper to coalesce devpages
June 6
- Configured wireless access point in FabLab
- Took Video documentation on CNC Torch Table and assisted with testing
- Made a tutorial for using xchat on the collaboration architecture presentation
June 5
- Configured two routers in hablab [1]
- Began work on consolidating work logs
- Began refinement of Torch cutter goals and documentation of recent development here
June 4
- Finished instructional for the CEB Grate
- Installed new internet connection from the mud huts (Nope, broken again, will fix tomorrow)
- Implanted gcode into the torch table for testing purposes.
June 3
- Organized power tool and began to label shelves and drawers
- Began construction and time lapse of Liberator
- Found potential solutions to implanting a modified gcode file manually to the torchtable
- Researched burying a cat5 cable (notes)
June 2
- Augmented the Collaboration Architecture slideshow to include instructions about installing SketchUp on Ubuntu 12.04
- Recorded and participated in Liberator deconstruction time lapse
- Assisted in Ubuntu installations
- Recorded extension cord salvation
- Planted tomatoes and soy
June 1
- Constructed a proposal for youtube raw media upload standards
Ongoing todo list
- Polish youtube raw uploads specifications
- Continue to upload to Trovebox
- Push IRC
- Upload CNC Torch table documentation
- Learn KiCode
- Find way of going from FreeCad to Sketchup Vice Versa
- Update calender
- NOLS Prereqs