Ellena log: Difference between revisions
Jump to navigation
Jump to search
Line 4: | Line 4: | ||
=Thurs Jul 17, 2014= | =Thurs Jul 17, 2014= | ||
Build shelves in the old workshop to organize into an outdoor kitchen space. | Build shelves in the old workshop to organize into an outdoor kitchen space. | ||
Assist with hydraulic tubing for | Assist with hydraulic tubing, installing quick couplers on tubes for CEB | ||
=Fri Jul 18, 2014= | =Fri Jul 18, 2014= |
Revision as of 19:26, 22 July 2014
Wed Jul 16, 2014
Arrive at the farm!
Thurs Jul 17, 2014
Build shelves in the old workshop to organize into an outdoor kitchen space. Assist with hydraulic tubing, installing quick couplers on tubes for CEB
Fri Jul 18, 2014
hydraulic tubing for brick press. assisted with installation of the shaker, and the grate. Pressed 2 bricks! -the soil was too wet.
worked on publicity for microhouse workshop, reaching out to several colleges and universities in Missouri
Mon Jul 21, 2014
morning:
removed hopper, grate, and shaker from CEB in order to manually produce bricks. conducted several soil tests on piles 1,2,3 of soil. pressed several bricks manually, and recorded data on brick uniformity
afternoon
assisted with installing metal siding of pool