MicroHouse 3 - Module - Review: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
No edit summary
Line 9: Line 9:
==Question 1==
==Question 1==
Should the first floor bond beam go around the entire perimeter of the house?
Should the first floor bond beam go around the entire perimeter of the house?
[[File:BondBeam.jpg|500px]]
[[File:BondBeam.jpg|500px]]



Revision as of 15:43, 19 August 2014

Response Form


Review Request Document


edit this document

Review Question Media

Question 1

Should the first floor bond beam go around the entire perimeter of the house?

Error creating thumbnail: File missing

Question 2

Is the mounting of rafters to the upper and lower mid truss strong enough?

Error creating thumbnail: File missing
Error creating thumbnail: File missing

Should cripple studs be added to connect the upper and lower 2x12’s and the rafters?

Error creating thumbnail: File missing

Question 3

In what order should the flashing, tar paper, and corrugated roofing be installed?

Error creating thumbnail: File missing