Door Requirement: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
No edit summary
No edit summary
Line 3: Line 3:
*Bond beam is directly above it.
*Bond beam is directly above it.
*Finishing detail involves direct transition from door frame to stucco metal lath without need for any other trim
*Finishing detail involves direct transition from door frame to stucco metal lath without need for any other trim
*Library North French Doors: left inswing (opening to the inside)
*Utility South Door: right inswing (opening to the inside)
*Utility East Door: right inswing (opening to the inside)

Revision as of 15:05, 10 September 2014

  • Door is only 7' high (same as wall) because of the height requirement of ceiling.
  • Door must be integrated into 1' thick CEB wall with stucco and 2" EPS insulation.
  • Bond beam is directly above it.
  • Finishing detail involves direct transition from door frame to stucco metal lath without need for any other trim
  • Library North French Doors: left inswing (opening to the inside)
  • Utility South Door: right inswing (opening to the inside)
  • Utility East Door: right inswing (opening to the inside)