=Requirement= | |||
*1' wide stem wall | |||
*Shallow insulated footer | |||
*2"x10" forms | |||
*Stands 1-2" above floor | |||
*Includes concrete pad for stove and for bathroom | |||
*Provision must be made that CEB walls do not risk water damage in the event of house flooding via water leaks | |||
*Foundation plan facilitates installation of CEB floor | |||
*Foundation plan facilitates installation of hydronic heating | |||
*Foundation plan facilitates installation of water and power lines in perimeter of floor |
Revision as of 16:04, 7 September 2014
Requirement
- 1' wide stem wall
- Shallow insulated footer
- 2"x10" forms
- Stands 1-2" above floor
- Includes concrete pad for stove and for bathroom
- Provision must be made that CEB walls do not risk water damage in the event of house flooding via water leaks
- Foundation plan facilitates installation of CEB floor
- Foundation plan facilitates installation of hydronic heating
- Foundation plan facilitates installation of water and power lines in perimeter of floor