MicroHouse 4 Foundation: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 4: | Line 4: | ||
*2"x10" forms | *2"x10" forms | ||
*Stands 1-2" above floor | *Stands 1-2" above floor | ||
*Includes concrete pad for | *Includes concrete pad for [[Hydronic Stove]] and for bathroom | ||
*Provision must be made that CEB walls do not risk water damage in the event of house flooding via water leaks | *Provision must be made that CEB walls do not risk water damage in the event of house flooding via water leaks | ||
*Foundation plan facilitates installation of CEB floor | *Foundation plan facilitates installation of CEB floor |
Revision as of 16:05, 7 September 2014
Requirement
- 1' wide stem wall
- Shallow insulated footer
- 2"x10" forms
- Stands 1-2" above floor
- Includes concrete pad for Hydronic Stove and for bathroom
- Provision must be made that CEB walls do not risk water damage in the event of house flooding via water leaks
- Foundation plan facilitates installation of CEB floor
- Foundation plan facilitates installation of hydronic heating
- Foundation plan facilitates installation of water and power lines in perimeter of floor