Door Requirement: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 6: | Line 6: | ||
*Utility South Door: right inswing (opening to the inside) | *Utility South Door: right inswing (opening to the inside) | ||
*Utility East Door: right inswing (opening to the inside) | *Utility East Door: right inswing (opening to the inside) | ||
<html><iframe src="https://docs.google.com/presentation/d/16M_ua0e8h9DZGiiH34Jc7KFiR_D0jGq7IWTQKjLOXFw/embed?start=false&loop=false&delayms=3000" frameborder="0" width="960" height="569" allowfullscreen="true" mozallowfullscreen="true" webkitallowfullscreen="true"></iframe></html> |
Revision as of 15:43, 10 September 2014
- Door is only 7' high (same as wall) because of the height requirement of ceiling.
- Door must be integrated into 1' thick CEB wall with stucco and 2" EPS insulation.
- Bond beam is directly above it.
- Finishing detail involves direct transition from door frame to stucco metal lath without need for any other trim
- Library North French Doors: left inswing (opening to the inside)
- Utility South Door: right inswing (opening to the inside)
- Utility East Door: right inswing (opening to the inside)