Power Cube 7 Workshop Organization: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
No edit summary
No edit summary
Line 5: Line 5:
Since Factor e Farm is already suitably equipped, these details have not been heavily documented.  Now that workshops are being held at remote locations, documentation is necessary for coordination in advance with remote facilities.
Since Factor e Farm is already suitably equipped, these details have not been heavily documented.  Now that workshops are being held at remote locations, documentation is necessary for coordination in advance with remote facilities.


The document below lists the requirements for coordinating a workshop at a remote site.  It is editable to allow updates.
The document below lists the requirements for coordinating a workshop at a remote site.  It is intended to be sent to the remote facilitators in preparation for hosting a Workshop.  It is editable to allow updates.


[https://docs.google.com/document/d/1iiAC8YyBmyJ8XRq8nUrEsoCsFbp7PBQQtaGCiIZ6SVc/edit PC7 Workshop Requirements]
[https://docs.google.com/document/d/1iiAC8YyBmyJ8XRq8nUrEsoCsFbp7PBQQtaGCiIZ6SVc/edit PC7 Workshop Requirements]
The BOM on the Power Cube page lists the materials and parts required for a Power Cube - also required for the workshop.
The Workshop schedule is also important for coordinating the workshop flow.

Revision as of 01:06, 25 February 2015

Organizing a workshop for the Power Cube, Ver 7

The Power Cube 7 workshops are very intensive in requirements for safety, facility and equipment.

Since Factor e Farm is already suitably equipped, these details have not been heavily documented. Now that workshops are being held at remote locations, documentation is necessary for coordination in advance with remote facilities.

The document below lists the requirements for coordinating a workshop at a remote site. It is intended to be sent to the remote facilitators in preparation for hosting a Workshop. It is editable to allow updates.

PC7 Workshop Requirements

The BOM on the Power Cube page lists the materials and parts required for a Power Cube - also required for the workshop.

The Workshop schedule is also important for coordinating the workshop flow.