Workshop Readiness Assessment: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
(Created page with "To determine whether a product is ready to be produced in a successful workshop, here are some considerations? #What is the current build time? #How many units have been buil...")
 
No edit summary
Line 7: Line 7:
#What is the build preparation time for sourcing materials and preparing workshop documentation?
#What is the build preparation time for sourcing materials and preparing workshop documentation?
#What is the material cost per unit?
#What is the material cost per unit?
#
#What is the value of a comparable product purchased off the shelf?
#Prior to workshop, how much time is required for (1) finding sourcing; (2) purchasing; (3) receiving; (4) inventorying; (5) precutting, pre-processing materials; (6) doing or outsourcing any other fabrication; (7) sourcing, preparing, and maintaining tools; (8)

Revision as of 08:21, 14 April 2015

To determine whether a product is ready to be produced in a successful workshop, here are some considerations?

  1. What is the current build time?
  2. How many units have been built?
  3. What bugs exist in the design?
  4. What are the challenges during the build?
  5. What is the build preparation time for sourcing materials and preparing workshop documentation?
  6. What is the material cost per unit?
  7. What is the value of a comparable product purchased off the shelf?
  8. Prior to workshop, how much time is required for (1) finding sourcing; (2) purchasing; (3) receiving; (4) inventorying; (5) precutting, pre-processing materials; (6) doing or outsourcing any other fabrication; (7) sourcing, preparing, and maintaining tools; (8)