Israel Log: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
(Created page with "= Wed, April 6, 2016 = * Called Folger Tech to inform them of future order, left message, and got a call back confirming. Will call back later to verify once more.")
 
Line 1: Line 1:
= Mon, April 11, 2016 =
* Wrote Seattle Buid Group description
https://www.google.com/url?q=https%3A%2F%2Fwww.dropbox.com%2Fs%2F2tx7s4tc9rowmgr%2Fsxg.html%3Fdl%3D0&sa=D&sntz=1&usg=AFQjCNG9LT5pA6cjm1n5mLg-vL2f5HLjFw
= Wed, April 6, 2016 =
= Wed, April 6, 2016 =


* Called Folger Tech to inform them of future order, left message, and got a call back confirming. Will call back later to verify once more.
* Called Folger Tech to inform them of future order, left message, and got a call back confirming. Will call back later to verify once more.

Revision as of 23:30, 11 April 2016

Mon, April 11, 2016

  • Wrote Seattle Buid Group description

https://www.google.com/url?q=https%3A%2F%2Fwww.dropbox.com%2Fs%2F2tx7s4tc9rowmgr%2Fsxg.html%3Fdl%3D0&sa=D&sntz=1&usg=AFQjCNG9LT5pA6cjm1n5mLg-vL2f5HLjFw


Wed, April 6, 2016

  • Called Folger Tech to inform them of future order, left message, and got a call back confirming. Will call back later to verify once more.