Israel Log: Difference between revisions
Jump to navigation
Jump to search
(Created page with "= Wed, April 6, 2016 = * Called Folger Tech to inform them of future order, left message, and got a call back confirming. Will call back later to verify once more.") |
|||
Line 1: | Line 1: | ||
= Mon, April 11, 2016 = | |||
* Wrote Seattle Buid Group description | |||
https://www.google.com/url?q=https%3A%2F%2Fwww.dropbox.com%2Fs%2F2tx7s4tc9rowmgr%2Fsxg.html%3Fdl%3D0&sa=D&sntz=1&usg=AFQjCNG9LT5pA6cjm1n5mLg-vL2f5HLjFw | |||
= Wed, April 6, 2016 = | = Wed, April 6, 2016 = | ||
* Called Folger Tech to inform them of future order, left message, and got a call back confirming. Will call back later to verify once more. | * Called Folger Tech to inform them of future order, left message, and got a call back confirming. Will call back later to verify once more. |
Revision as of 23:30, 11 April 2016
Mon, April 11, 2016
- Wrote Seattle Buid Group description
Wed, April 6, 2016
- Called Folger Tech to inform them of future order, left message, and got a call back confirming. Will call back later to verify once more.