Open Source PV System: Difference between revisions
Jump to navigation
Jump to search
(→BOM) |
|||
Line 3: | Line 3: | ||
<html><iframe width="560" height="315" src="https://www.youtube.com/embed/aKQZQICFaTU" frameborder="0" gesture="media" allow="encrypted-media" allowfullscreen></iframe></html> | <html><iframe width="560" height="315" src="https://www.youtube.com/embed/aKQZQICFaTU" frameborder="0" gesture="media" allow="encrypted-media" allowfullscreen></iframe></html> | ||
See also [https://docs.google.com/presentation/d/1vQfhPlXS_vJGkYRJcvUnbud3ryMP_dP8ayYoYqu57t4/edit#slide=id.g1861bf60d5_0_6 final system diagram]. | |||
=BOM= | =BOM= |
Revision as of 04:48, 18 December 2017
December 2017 - Completion Walk-Through
- After testing various loads including internet, lighting, washer, dryer, hydronic pumping, water pumping, macerator lift pump, computers, refrigerator, freezer, vaccuum cleaner, microwave oven, cutoff saw and power tools, and other various appliances - the working system is this:
See also final system diagram.
BOM
- 24-12 step down - [1]
Seed Eco-Home
Working Documents
Final
Initial
CAD
Cabinet:
- Width: 40.25"
- Height: 48"
- Depth: 17.5"
Electrical Panel
- Battery - File:Battery.fcstd
- Deep Electrical box - File:Deepbox.fcstd
- Deep box with switch - File:Deepbox switch.fcstd
- Triple deep box with switch - File:Deepbox switch triple.fcstd
- Shallow electrical box - File:Shallowbox.fcstd
- Charge Controller - File:Chargecontroller.fcstd
- 5kW + 8kW Inverter - File:5kWinverter.fcstd
- Breaker Box - File:Breakerbox.fcstd
- Electrical Closet - File:Electrical closet.fcstd
- Electrical Panel Assembly - File:Electrical panel assembly.fcstd
Initial Testing 2016
FB Post
Electrical Plan - Seed Eco-Home
Faculty House 2015
BOM
Inverter
- Fuse - glass, 250V,F25AL - 6mmx30mm - [100 Pcs Glass Fuses 25A 250V 6mm x 30mm Fast Blow Skywalking]
Lighting
Data
- Intial performance data collection - PV System Log