Sara Kit Build: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
No edit summary
 
Line 6: Line 6:


<html><iframe width="560" height="315" src="https://www.youtube.com/embed/hdpkz1j1_m8" frameborder="0" allow="accelerometer; autoplay; encrypted-media; gyroscope; picture-in-picture" allowfullscreen></iframe></html>
<html><iframe width="560" height="315" src="https://www.youtube.com/embed/hdpkz1j1_m8" frameborder="0" allow="accelerometer; autoplay; encrypted-media; gyroscope; picture-in-picture" allowfullscreen></iframe></html>
*8:58am start
*9:15 two y left Axes completed
*9:44 two y right Axes completed
*9:51 x axis completed
*10:17 extruder completed
*10:32 heated bed completed
*10:57 control panel completed
*11:28 four Axes mounted to frame
*11:36 x axis mounted to frame
LUNCH BREAK...
*TIMELAPSE RESUMES 1:13 PM
*1:20 glued end stops
*1:26 assembled and mounted bed support
*1:35 extruder mounting
TIME LAPSE PAUSES....AS I ASSESS POSSIBLE ISSUE HITTING RODS AND DISCUSS WITH ALEX
*1:44 time lapse resumes (9 minutes lost)
*2:01 heated bed mounted
*2:10 control panel mounted and stepper wires plugged in
*3:07 cable chain and tidying completed
TIME LAPSE PAUSES SO I CAN TAKE CLEAR PHOTOS OF PRINTER (6 minutes lost)
*3:13 spool holder and filament mounted, timelapse resumes
*3:44 time lapse ends as I continue test prints


<html><iframe src="https://docs.google.com/presentation/d/e/2PACX-1vTFhZ5CgZTFMUvRsyhMuK5EoOMswyxl9TDiri2z_yTONe3lTYvrtJebzJf1ijBCNSNcDYGru-JWgzQ3/embed?start=false&loop=false&delayms=3000" frameborder="0" width="960" height="569" allowfullscreen="true" mozallowfullscreen="true" webkitallowfullscreen="true"></iframe></html>
<html><iframe src="https://docs.google.com/presentation/d/e/2PACX-1vTFhZ5CgZTFMUvRsyhMuK5EoOMswyxl9TDiri2z_yTONe3lTYvrtJebzJf1ijBCNSNcDYGru-JWgzQ3/embed?start=false&loop=false&delayms=3000" frameborder="0" width="960" height="569" allowfullscreen="true" mozallowfullscreen="true" webkitallowfullscreen="true"></iframe></html>

Latest revision as of 16:43, 30 November 2018

Nov 28, 2018

edit

  • 8:58am start
  • 9:15 two y left Axes completed
  • 9:44 two y right Axes completed
  • 9:51 x axis completed
  • 10:17 extruder completed
  • 10:32 heated bed completed
  • 10:57 control panel completed
  • 11:28 four Axes mounted to frame
  • 11:36 x axis mounted to frame

LUNCH BREAK...

  • TIMELAPSE RESUMES 1:13 PM
  • 1:20 glued end stops
  • 1:26 assembled and mounted bed support
  • 1:35 extruder mounting

TIME LAPSE PAUSES....AS I ASSESS POSSIBLE ISSUE HITTING RODS AND DISCUSS WITH ALEX

  • 1:44 time lapse resumes (9 minutes lost)
  • 2:01 heated bed mounted
  • 2:10 control panel mounted and stepper wires plugged in
  • 3:07 cable chain and tidying completed

TIME LAPSE PAUSES SO I CAN TAKE CLEAR PHOTOS OF PRINTER (6 minutes lost)

  • 3:13 spool holder and filament mounted, timelapse resumes
  • 3:44 time lapse ends as I continue test prints

Nov 17, 2018

edit