Seed Eco-Home Index: Difference between revisions
Jump to navigation
Jump to search
(→Design) |
(→Links) |
||
Line 43: | Line 43: | ||
=Links= | =Links= | ||
*More technical, development, and organizational assets at [[OBI]]. | *More technical, development, and organizational assets at [[OBI]]. | ||
*'''OBI Drive - Modules instructionals''' - [https://drive.google.com/drive/folders/0B0NG-lv1ELQvLWNPdEpzUS1oWjg] | |||
*'''OBI Drive''' - [https://drive.google.com/drive/folders/0B0NG-lv1ELQvaFFPODM1MURIR0k] | |||
[[Category:SMEs]] [[Category:House]] [[Category:Seed Eco-Home]] | [[Category:SMEs]] [[Category:House]] [[Category:Seed Eco-Home]] |
Revision as of 17:54, 7 August 2020
Design
Hint: All the available technical and conceptual design, as well as build instructions, are at the OBI Google Drive - [1]
- The Building Book - discussing how to design the house - is at [2]
Seed Eco-Home Part Library - FreeCAD
Data Collection
- Costs - [3]
- Seed Eco-Home Log
- House Temperatures - [4]
- Pellet stove fuel use - [5]
- PV system data - Intial performance data collection - PV System Log
Finishing
Seed Eco-Home BOM
- Seed Eco-Home BOM
- Air admittance valve - [8]. Info - [9]
Subject Matter Experts
These are Subject Matter Experts sought for the Seed Eco-Home:
Utilities Finishing
- 5/01/17 - 340 labor, 390 materials.
- 5/8/17 - 310 labor
- 5/19/17 - 400 labor, 209 materials
- 5/25/17 - 490 labor, 187 materials
- 7/21/17 - 1325 labor, 460 materials
- 7/28/17 - 575 l
- 8/7/17 - 725 l, 327 m
- 8/11/17 - 2/3 labor