Anna Sera Lowe: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
No edit summary
No edit summary
Line 10: Line 10:
*Some tools exist in the constuction field - for distributed quality control.
*Some tools exist in the constuction field - for distributed quality control.
*There is Field Sighte - doing an app to allow remote inspection by qualified engineers.
*There is Field Sighte - doing an app to allow remote inspection by qualified engineers.
*https://app.fieldsight.org/users/accounts/login/
*https://app.fieldsight.org/users/accounts/login/ - DQC for housing
*Centralized production - not scalable at all.
*Centralized production - not scalable at all.
*Pull approach via a business model - blockchain prototype for distributed contracting, with quality control built in. Multiple places producing parts for an order. Approval before the next bit. If you have quality spec-ed out up front - then the theory is - that would drive quality compliance. Were doing it under - FieldReady tried this in Nepal - Daniel Paterson.
*Pull approach via a business model - blockchain prototype for distributed contracting, with quality control built in. Multiple places producing parts for an order. Approval before the next bit. If you have quality spec-ed out up front - then the theory is - that would drive quality compliance. Were doing it under - FieldReady tried this in Nepal - Daniel Paterson.
*Making supplies near points that are needed.

Revision as of 16:33, 6 August 2020

  • Open Know-How - https://openknowhow.org/
  • Open Know-Where
  • Open Source Fabrication Equipment - not there yet
  • What is the information required to characterize a piece of equipment?
  • Data model - in iteration.
  • Open Know-Where - how we characterize equipment - chairing by Anna
  • Andrew Lamb from Shuttleworth - funding the Open Know-Where
  • Barbal - https://barbal.co/ - software for documenting
  • Internet of Prodution Alliance - renamed Makernet Alliance - reasonably active community of people with day jobs
  • Some tools exist in the constuction field - for distributed quality control.
  • There is Field Sighte - doing an app to allow remote inspection by qualified engineers.
  • https://app.fieldsight.org/users/accounts/login/ - DQC for housing
  • Centralized production - not scalable at all.
  • Pull approach via a business model - blockchain prototype for distributed contracting, with quality control built in. Multiple places producing parts for an order. Approval before the next bit. If you have quality spec-ed out up front - then the theory is - that would drive quality compliance. Were doing it under - FieldReady tried this in Nepal - Daniel Paterson.
  • Making supplies near points that are needed.