Seed Home 2 Quality Control: Difference between revisions
Jump to navigation
Jump to search
(Created page with "This refers to build qaulity and code compliance, and how to negotiate it effectively. =Inspection Schedule= *Feedback on Inspection Schedule") |
|||
Line 3: | Line 3: | ||
=Inspection Schedule= | =Inspection Schedule= | ||
*[[Feedback on Inspection Schedule]] | *[[Feedback on Inspection Schedule]] | ||
=Seed Home Entrepreneur Contract= | |||
Clear delivery must be encoded in a contract, such that quality control points are addressed: | |||
#Custom design audit - Seed Home Entrepreneur (SHE) publishes custom design package on their log. OSE audits the design modification. | |||
#BOM |
Latest revision as of 18:59, 30 August 2020
This refers to build qaulity and code compliance, and how to negotiate it effectively.
Inspection Schedule
Seed Home Entrepreneur Contract
Clear delivery must be encoded in a contract, such that quality control points are addressed:
- Custom design audit - Seed Home Entrepreneur (SHE) publishes custom design package on their log. OSE audits the design modification.
- BOM