Foundation Skirting: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
|||
Line 4: | Line 4: | ||
[https://docs.google.com/presentation/d/1dPUzcICBv2pcKhwwae50aqQLBOyr42TXXZbg007DBMA/edit#slide=id.g10530ee54e6_0_16 edit] | [https://docs.google.com/presentation/d/1dPUzcICBv2pcKhwwae50aqQLBOyr42TXXZbg007DBMA/edit#slide=id.g10530ee54e6_0_16 edit] | ||
=Installation Procedure= | |||
#Grade with MicroTrac - scrape hardened ground - then till until soft and grade of insulation can be finished easily by raking | |||
# | |||
=Materials= | =Materials= |
Revision as of 04:49, 6 December 2021
Working Doc
Installation Procedure
- Grade with MicroTrac - scrape hardened ground - then till until soft and grade of insulation can be finished easily by raking
Materials
Design Issues
The detail where house siding meets the ground is important:
- Splashing of rain - if there is exposed dirt - house will get splashed and dirty, or continued exposure to water at this detail will tend to rot the house if water-sensitive materials such as wood are used. Aesthetically - dirty collar around the bottom of a house is not aesthetic.
- Moisture prevention - do not create a cavity under the siding that traps humidity. See comment 1 at [4]
Products
Mobile Homes
Regular Homes
- Foundation Panel - insulated with finish look - [9]