Under Construction Phase Inspections: Difference between revisions
Jump to navigation
Jump to search
(Created page with "https://www.homeinspectalaska.com/construction-phase-inspections/#:~:text=The%20framing%20inspection%20should%20be,installed%20and%20framing%20is%20complete.&text=All%20rough%...") |
No edit summary |
||
Line 1: | Line 1: | ||
https://www.homeinspectalaska.com/construction-phase-inspections/#:~:text=The%20framing%20inspection%20should%20be,installed%20and%20framing%20is%20complete.&text=All%20rough%20wiring%20for%20the,inspected%20at%20the%20same%20time. | Document for Alaska - [https://www.homeinspectalaska.com/construction-phase-inspections/#:~:text=The%20framing%20inspection%20should%20be,installed%20and%20framing%20is%20complete.&text=All%20rough%20wiring%20for%20the,inspected%20at%20the%20same%20time.] | ||
=Site Plan= | |||
*this is the first inspection | |||
=Foundation= | |||
=Framing= | |||
*Includes both interior and exterior walls, load bearing or not. Inspection is done after all rough-in plumbing and electrical, and ducting is in place. |
Revision as of 04:30, 10 January 2022
Document for Alaska - [1]
Site Plan
- this is the first inspection
Foundation
Framing
- Includes both interior and exterior walls, load bearing or not. Inspection is done after all rough-in plumbing and electrical, and ducting is in place.