=Detailed Checklist=
https://mybuildingpermit.com/sites/default/files/inline-files/IC_Residential_Plumbing-Rough-In_Final.pdf
https://mybuildingpermit.com/sites/default/files/inline-files/IC_Residential_Plumbing-Rough-In_Final.pdf



Revision as of 06:48, 2 April 2022

Detailed Checklist

https://mybuildingpermit.com/sites/default/files/inline-files/IC_Residential_Plumbing-Rough-In_Final.pdf

Notes

  • Each trap protected by vent
  • See cleanout requirements.
  • Ford Fitting for water supply line if supply line connection is inside the house.
  • Water pressure test required
  • Vacuum breakers on hose outlets
  • Supply water line fill is inspected prior to covering
  • Approved grounding system for water supply line?
  • Tracer wire for water supply from meter to foundation

Sequencing

  • Since it is a fixture [1] - a water heater is installed in the finish phase [2]
  • Water heater is often installed at rough plumbing phase [3]