Tunnels: Difference between revisions
Jump to navigation
Jump to search
(Created page with "*There is huge red tape for building tunnels, and costs are $100M-$1B per mile [https://www.nbcnews.com/tech/tech-news/urban-tunnels-musk-s-boring-co-draw-industry-skepticism-...") |
No edit summary |
||
Line 1: | Line 1: | ||
*There is huge red tape for building tunnels, and costs are $100M-$1B per mile [https://www.nbcnews.com/tech/tech-news/urban-tunnels-musk-s-boring-co-draw-industry-skepticism-n1269677] | *There is huge red tape for building tunnels, and costs are $100M-$1B per mile [https://www.nbcnews.com/tech/tech-news/urban-tunnels-musk-s-boring-co-draw-industry-skepticism-n1269677]. The Boring Company was supposed to do $10M/mile |
Revision as of 02:08, 11 September 2022
- There is huge red tape for building tunnels, and costs are $100M-$1B per mile [1]. The Boring Company was supposed to do $10M/mile