Advanced Framing: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 5: | Line 5: | ||
Read this: http://www.apawood.org/data/sharedfiles/documents/m400.pdf | Read this: http://www.apawood.org/data/sharedfiles/documents/m400.pdf | ||
=External Links= | |||
*Advanced framing - [https://www.apawood.org/advanced-framing] | |||
=Links= | =Links= | ||
*[[Post and Beam vs Balloon vs Platform Framing]] | *[[Post and Beam vs Balloon vs Platform Framing]] | ||
*[[Framing Costs]] | *[[Framing Costs]] | ||
*[[Balloon Framing vs Platform Framing]] | *[[Balloon Framing vs Platform Framing]] |
Revision as of 19:19, 4 October 2022
"Advanced framing, also called optimum value engineering (OVE), is a framing system that aims to pare the amount of lumber used to frame buildings to the bare minimum. Advanced framing was developed in the 1960s by the Department of Housing and Urban Development as a way for builders to reduce costs."
And it's code compliant!
Read this: http://www.apawood.org/data/sharedfiles/documents/m400.pdf
External Links
- Advanced framing - [1]