Sat Feb 10 2023 Notes: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 1: | Line 1: | ||
'''Build Items:''' | '''Build Items:''' | ||
#Exterior trim | |||
#Door installation | |||
#Siding | |||
'''Done''' | |||
#Foundation trim - 8 hr + 4 hrs = 11 hrs + 20 min rivets | |||
*Stairs | *Stairs | ||
*Landing | *Landing | ||
Line 15: | Line 20: | ||
*Heat pump | *Heat pump | ||
*Trellis | *Trellis | ||
*Interior frame, electrical, plumbing | *Interior frame, electrical, plumbing | ||
*Beadboard | *Beadboard |
Revision as of 16:18, 18 February 2023
Build Items:
- Exterior trim
- Door installation
- Siding
Done
- Foundation trim - 8 hr + 4 hrs = 11 hrs + 20 min rivets
- Stairs
- Landing
- Canopy
- Behind tub and behind stair sheet and insulation
- Front porch
- 2nd floor ceiling insulation
- 2nd floor ceiling
- Interior sill plates sketches
- Sill plates (none on 2nd)
- Power center
- Inverter
- PV
- Heat pump
- Trellis
- Interior frame, electrical, plumbing
- Beadboard
- Paint interior
- Kitchen cabinets
- Bathroom
- Finish floor
- Driveway
- Sewer
- Water
- Power connection
- Landscaping - tree spade etc
Design Items:
- Garage deck
- Build order doc - walls/insul/landing/stair/etc
- Inverter
- Power center and trenching
- Canopy
- Trellis
- Overall garage top build order doc